Similar Projects
Seeling Channel Phase 3 Project
Bidding
$15,080,000 est. value
San Antonio, TX 78205

Converse Sidewalk Project
Post-Bid
Less than $370,000 est. value
Converse, TX 78109

Main Street Sidewalk Replacement
Post-Bid
San Antonio, TX

2019 Reclamation Reconstruction Task Order Contract Package 6
Results
San Antonio, TX 78205

Escondido Creek Parkway Construction
Results
Less than $2,600,000 est. value
San Antonio, TX

Gravel Construction
Post-Bid
San Antonio, TX

Bus/Student Covered Walkway at William P.Hobby Middle School
Results
San Antonio, TX 78230

East Aviation Boulevard - Operational Improvements
Post-Bid
Less than $5,500,000 est. value
Universal City, TX 78148

2017 Bond Program-Pedestrian Mobility Task Order Contract Package 3
Results
$3,000,000 est. value
San Antonio, TX

2020-2021 Task Order Contracts for Flatwork and Street Improvements Package 4
Term Contract
Post-Bid
$980,000 est. value
San Antonio, TX 78205

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 4
Results
Less than $3,000,000 est. value
TX

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Construct Sidewalk, Curb Ramps and Ped Imprv
Results
Less than $1,915,606 est. value
TX

River Walk Improvements Phase VI
Post-Bid
Less than $2,850,000 est. value
San Antonio, TX 78205

West San Antonio Avenue Pavement and Pedestrian Improvements
Results
Less than $250,884 est. value
Fair Oaks Ranch, TX 78006

Last Updated 05/23/2019 09:51 AM
Project Title

Resident Parking Lot 5

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project will add more than 200 parking stalls by expanding an existing parking lot due east of the Science Research Laboratory and Margaret Batts Tobin Laboratories (SRL/MBT) buildings. This project’s purpose is to make up for lost parking areas on campus due to other buildings being constructed.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents