Project Title | Buechel RC Latrine Renovation |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY 40218 (Jefferson County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $326,432 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists selective demolition and subsequent renovation of areas within the Buechel National Guard Readiness Center located in Buechel, Jefferson County, KY. Work includes demolition of existing Men’s Latrine, including removal and subsequent offsite disposal of existing architectural finishes, plaster ceiling system, ceramic tile flooring, doors, frames & hardware, glazed tile and concrete masonry partitions required to accommodate new building improvements. In addition work includes cutting of new openings to accommodate installation of a new Lactation Room in an existing storage space between Office 110 and the Women’s Latrine. New work to be performed includes installation of new Men’s Latrine including fixtures and finishes, erection of new light gage metal stud and gypsum board partitions, new hollow metal doors and frames, new door hardware, new ceramic tile, solid surfacing shower enclosures, new acoustic tile ceilings, new carpet tile, MMA flooring, and limited plastic laminate casework. Mechanical improvements include new plumbing and piping, removal and reinstallation of existing VRF cassette, installation of a new panel heater, and associated systems controls. Electrical work includes new circuitry, lighting, conduit, fixtures and trim. In association with the cited improvements, proposed work to be performed under the contract includes the abatement of asbestos containing materials (ACM) associated with pipe insulation on active water lines. The abatement contractor will use glove bag methods to abate the identified thermal system insulation consisting of air cell and associated elbows and fittings, and will conduct air monitoring for clearance sampling prior to releasing the area to the general contractor to recommence work. Abatement tasks to be performed include: securing approval from a Subtitle D landfill, coordination with general contractor to protect existing facilities, demolition of ceiling areas to access the ACM, abatement of the ACM using glove bag methods, air monitoring as appropriate to determine areas is clear for occupancy prior to releasing area back to the general contractor. The Project has two (2) additive Alternates, which if accepted will become part of the work. Add Alternate No. 1 includes removal and replacement of existing light fixtures throughout the Readiness Center at locations shown. Add Alternate No. 2 includes the removal and replacement of two washbasins, one single and one double, and associated fixtures in the Women’s Latrine. |
||||||||||||||||||
Details | Military Facility, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |