Similar Projects
Operations of Water/Wastewater Treatment Facilities and Lift Station
Post-Bid
Mercedes, TX 78578

Laredo College Waterlines Replacement Project - Phase I
Term Contract
Post-Bid
$75,000 est. value
Laredo, TX 78040

Water Service Line Replacement, Bldg 2011
Results
$100,000 to $250,000 est. value
El Paso, TX 79916

Pleasanton Road Water Main Replacement at Hume Road
Results
Less than $3,850,000 est. value
San Antonio, TX

Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

LPAWA Transmission Main Replacement
Results
La Porte, TX

Schedule 40 PVC Pipe
Term Contract
Post-Bid
Corpus Christi, TX 78401

Water Line Replacement Phase Six to Serve Riverwood Village Section One
Results
TX

Water and Sewer Connections
Term Contract
Post-Bid
Greenville, TX 75401

Construction of Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Fosters Ridge, Section Sixteen and Fosters Ridge, Section Seventeen
Results
TX

Advanced Metering Infrastructure (AMI) Solution for the Connect H20 Program
Post-Bid
$2,500,000 to $4,000,000 est. value
San Antonio, TX

Onsite Water, Sanitary Sewer and Storm Drainage and Offsite Water and Sanitary Sewer Improvements for Aspen Meadows Phase 1
Results
Denton, TX 76201

Meter Data Management System (Mdms) Solution for the Connect H20 Program
Post-Bid
San Antonio, TX 78212

Water, Sanitary Sewer, and Drainage Facilities, Paving and Appurtenances to Serve Mustang Trails Section 3
Results
Less than $1,636,000 est. value
TX

Justin Swift Water Improvements Phase 1 Part 2
Post-Bid
Justin, TX 76247

Last Updated 05/21/2021 08:27 AM
Project Title

Hudson Oaks and Willow Park Water Facilities and Wholesale Meter

Physical Address View project details and contacts
City, State (County) Willow Park, TX 76087   (Parker County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,528,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 455 feet of 14-inch to 20-inch water line, along El Chico Trail and Ranch Oak Drive, three motor operated valve vaults, two meter stations, pump station, 0.75 MG ground storage tank and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents