Similar Projects
Lost Lake Woods Club New Freight Elevator
Alteration
Bidding
Lincoln, MI 48742

39--Fall Restraints Purchase and Install
Term Contract
Bidding
Harrison Township, MI 48045

Replace Powerhouse Crane Rails
Post-Bid
$1,000,000 to $5,000,000 est. value
Sault Sainte Marie, MI 49783

Whiteboard Replacement
Post-Bid
Kalamazoo, MI

Fabric Structures with Related Materials and Services
Results

Fabric Structures with Related Materials and Services
Results

9905--Equipment - LED Sign - Saginaw
Term Contract
Bidding
Saginaw, MI

Equipment Rental
Post-Bid
Flint, MI

Three (3) 24 Gallon Waste Oil Drain Tanks, Lubeworks Model Gul004 or Approved Equivalent
Results
Clinton Township, MI 48035

Refurbishing of One Loader
Post-Bid
Big Rapids, MI

One (1) Dump Trailer
Results
Rochester Hills, MI

Traffic Signal Equipment Repairs, Annual Estimated Quantities
Term Contract
Post-Bid
MI

Power Monitor Installation Project
Results
Detroit, MI

Trash Compactor-LP
Post-Bid
Riverview, MI

Convenience Station Containers
Results
Saginaw, MI

Reported 09/08/2021 12:00 AM
Project Title

56--Rail System for Hangar 7 Mezzanine

Physical Address View project details and contacts
City, State (County) State-Wide: MI
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

FOB Destination shall be Selfridge ANGB, MI 48045 The Michigan Air National Guard Consolidated Contracting (MACC) requires the following items, Purchase Description Determined by Line Item, to the following: LI 001: Rail system on existing mezzanine in Hanger 7 10'W x 51'9" +/- table top rack supported mezzanine add on. Price includes landing for 85" top deck, B-deck, wood deck, support beams, OSHA handrails, kick plate, staircase landing supports, 1, Lot; Mezzanine Conversion - Hangar 7 10'W x 51'9" +/- table top rack supported mezzanine add on. Includes: - Landing for 85" Top of deck - B-deck - Wood deck - Support beams - OSHA handrail - Kick Plate - Staircase landing supports - Floor supports - The installation of customer owned staircase. - Touch up paint as / if needed

Details

Division 09 - Finishes.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents