Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

2022 Plant Mix
Infrastructure
Bidding
$2,767,000 est. value
VA

2022 Surface Treatment
Infrastructure
Bidding
$4,361,000 est. value

Paving Parking Lot at Chilhowie Farmers Market
Post-Bid
Chilhowie, VA 24319

Asphalt Paving - Hungry Mother State Park - Marion, Virginia
Post-Bid
Marion, VA 24354

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Water Activated Cold Patch
Term Contract
Results

2022 Plant Mix
Infrastructure
Bidding
$5,250,000 est. value

Paving
Infrastructure
Post-Bid
Saltville, VA

Shoulder Improvements
Results
Less than $4,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 Latex Modified
Results
Less than $2,135,000 est. value

2021 Plant Mix
Results
Less than $4,907,000 est. value

2021 Plant Mix
Results
Less than $2,400,000 est. value

Last Updated 11/30/2021 01:44 PM
Project Title

I-81 MM 48 Northbound Acceleration Lane Extension

Physical Address View project details and contacts
City, State (County) VA   (Smyth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project is located along I-81 northbound in Smyth County, Virginia. The purpose of the project is to improve safety and operations by extending the existing I-81 Exit 47 northbound on ramp approximately 3,900 feet from MM 48.1 to MM 48.8. The limits of the Project are from approximately 0.24 miles north of the I-81 NBL bridge over Rifton Dr. (F010) to approximately 0.1 miles south of the I-81 NBL bridge over Hutton Br. (Rte. 689) for a total length of approximately 0.79 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents