Similar Projects
Bridge and Approaches - SH 6
Infrastructure
Conception
$3,557,360 CJ est. value
Altus, OK 73521

Sewer Line Rehabilitation for the Sewer System Repairs
Infrastructure
Design
$2,000,000 CJ est. value
Martha, OK 73556

Bridge and Approaches - SH 19
Infrastructure
Design
$11,756,126 CJ est. value
Blair, OK 73526

8 Padmount Transformers for Downtown Park
Infrastructure
Bidding
$300,000 CJ est. value
Altus, OK 73521

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Sewer Line Rehabilitation
Infrastructure
Post-Bid
$360,000 CJ est. value
Headrick, OK 73549

Repair of Southeast Water Tower
Infrastructure
Results
$481,000 CJ est. value
Altus, OK 73521

Repair of Northwest Water Tower
Infrastructure
Results
$457,000 CJ est. value
Altus, OK 73521

Sheet Metal Storage Building and Asphalt Paving Apron at the Jackson County Expo Center
New Construction, Infrastructure
Post-Bid
$462,000 CJ est. value
Altus, OK 73521

Repair of Southwest Water Tower
Infrastructure
Results
$654,000 CJ est. value
Altus, OK 73521

B1029 Maintain-Repaint Taxiways
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Altus, OK 73523

Pedestrian Improvements (Sidewalks) - US-62
Infrastructure
Results
$816,630 CJ est. value
Duke, OK 73532

Jackson County Courthouse Early Site Work
Demolition, Infrastructure
Post-Bid
$890,000 CJ est. value
Altus, OK 73521

42 New Trail Lights at Veterans Court
Infrastructure
Results
$80,419 CJ est. value
Altus, OK 73521

Altus Trail Phase 1
Infrastructure
Post-Bid
$150,000 CJ est. value
Altus, OK 73521

Last Updated 05/03/2023 05:35 PM
Project Title

Altus Reservoir Culvert Installation

Physical Address View project details and contacts
City, State (County) Altus, OK 73521   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,963,955 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Altus, herein after called the "City," is seeking bids to construct a stormwater culvert at the Altus City Reservoir. The culvert is 1,751 feet long and consists of three 36-inch reinforced concrete pipes with eight cast-in-place reinforced concrete junction boxes and two triple 36-in headwalls along with other pipe work. Bids received more than ninety-six (96) hours before the time set for opening of bids, or any bid received after the time set for the opening of bids, shall not be considered and shall be returned unopened. Award shall be based on a determination of the lowest qualified bid. "Qualified" is a determination by the City regarding the capability of the bidder to perform the work in good faith, with integrity and reliability as well as the materiality of the bidder's errors, omissions, or exception This project involves the following elements. Bids shall provide labor, equipment, materials and incidentals needed to perform the following work: o Excavate about 19,000 cubic yards as needed to install new culvert. Bed pipe and backfill and designed. o Form and pour eight reinforced concrete junction boxes as designed. o Furnish and install 5,254 feet of 36-inch Reinforced Concrete Pipe. o Furnish and install 93 feet of 24-inch Reinforced Concrete Pipe. o Furnish and install 163 feet of 12-inch PVC Pipe and construct headwall and screen as designed. o Furnish and Install 428 feet of 18-inch PVC pipe and construct headwall and screen as designed. o Furnish and install 20 feet of 22"x13" corrugated galvanized steel arch pipe. o Construct two triple 36-in reinforced concrete headwalls. o Construct one double 22"x13" reinforced concrete headwall. o OPDES compliance and erosion and pollution controls as designed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents