Similar Projects
Water Station Electrical Improvements - Motor Control Replacement - Station 2, 21 and 22
Alteration
Conception
$820,000 est. value
Schaumburg, IL

Water Station Electrical Improvements - ATS Replacement - Station 20 and 21
Alteration
Conception
$490,000 est. value
Schaumburg, IL

Ballfield Lighting Replacement Project - West Side Park
Infrastructure
Sub-Bidding
$90,000 CJ est. value
Tolono, IL 61880

Towable Aircraft Ground Power Unit
Alteration
Post-Bid
Chicago, IL

Guaranteed Energy Savings Contract
Alteration
Post-Bid
Cairo, IL

Generator Load Bank Maintenance
Term Contract
Results
Hines, IL 60141

IVHC - Emergency Generator Maintenance Services
Alteration
Results
Chicago, IL

Upgrade Parking Lots, Drainage, Lighting, and Landscaping South Suburban College - Illinois Capital Development Board
Infrastructure
Pending Verification
$231,245 CJ est. value
South Holland, IL 60473

Electric Substations - Springbrook Fixed Axis Solar Photovoltaic Systems
Alteration
Post-Bid
La Grange, Naperville, IL 60540

Chicago Harbor Lock Power Distribution Upgrade
Term Contract
Results
$250,000 to $500,000 est. value
Chicago, IL

2022 HVAC Renovations
Alteration
Post-Bid
Skokie, IL

Seminole Lane Street Lighting
Alteration
Results
Mount Prospect, IL

Renovate Electronic Security System
Renovation
Post-Bid
$2,000,000 to $5,000,000 est. value
Chicago, IL 60612

Light Pole Replacement
Alteration
Results
Less than $3,000,000 est. value
Chicago, IL 60628

Replace Cooled Chiller
Alteration
Post-Bid
Carlyle, IL 62231

Last Updated 07/05/2023 04:09 PM
Project Title

KCPA Electrical Upgrades - Division 03 & Division 05

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,391,867 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing all medium voltage and low voltage electrical service equipment, unit substation, serving the mechanical equipment loads of the Mechanical Room 0-509 in KCPA. The electrical equipment to be replaced is one of four substations within a double ended looped system. This projects equipment is located in a caged section of the Mechanical Room (0-509) with-in the lower level of facility. Provide for the construction of a new electrical vault to house the medium voltage equipment and service entrance switch(es). New vault to be located in lower level parking area as shown. The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents