Similar Projects
Earlington Heights Metrorail Station Mixed Use
New Construction - 15,000 SF
Conception
Miami, FL 33142

Our Lady of the Rosary School Expansion
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL 33176

Rides Installation and Operation at Zoo Miami
Post-Bid
Miami, FL 33177

Pawcrest Dog Park Entryway
Post-Bid
Pinecrest, FL 33156

Tree Island Park - Phase 1 Park Development
Results
Less than $4,465,700 est. value
Miami, FL 33194

City Parks Poured-In-Place Playground Surfacing
Results
South Miami, FL

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Naranja Lakes Apartments
New Construction - 244,466 SF
Conception
$10,000,000 CJ est. value
Leisure City, FL

Quail Roost Park-New Playground Expansion and Surface Conversion
Post-Bid
Less than $592,000 est. value
Miami, FL 33157

Baseball Field Maintenance at Palmer Park
Results
South Miami, FL 33143

Lake Sana Development
New Construction
Conception
Miami, FL 33010

Sgt.Delancy - Playground Renovation
Post-Bid
Less than $263,200 est. value
Miami, FL 33176

Franjo Park Improvements Project
Results
Cutler Bay, FL 33189

Modello Park - Playground Renovation
Post-Bid
Less than $268,100 est. value
Homestead, FL 33033

Last Updated 11/15/2019 01:48 AM
Project Title

Roby George Park Locker Room Improvements and Outdoor Picnic Tables and Benches for Mayor Roscoe Warren Park

Physical Address View project details and contacts
City, State (County) Homestead, FL 33030   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pool and locker room improvements for Roby George Park and outdoor picnic tables and benches for Mayor Roscoe Warren Park, from a source of supply that will give prompt and efficient service. Location: Roby George Park: 201 SW 11 th Avenue, Homestead, FL 33030 Roscoe Warren Park: 1400 East Palm Drive, Homestead, FL 33035

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents