Similar Projects
Right of Way Fencing Project
Infrastructure
Sub-Bidding
$2,700,000 CJ est. value
San Carlos, CA 94070

As-Needed Fencing
Term Contract
Sub-Bidding
Long Beach, CA 90802

Narrows 1 Gate Hoist Repair
Term Contract
Post-Bid
Smartsville, CA 95977

Fence - North 12th Street Streetscape
Alteration
Post-Bid
$336,000 est. value
Sacramento, CA 95811

Temporary Fencing (On-Call)
Alteration
Results
Sacramento, CA

Kingston Park Fence
Alteration
Results
Hanford, CA 93230

Vista Heights Fencing
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Moreno Valley, CA 92557

Minor B - SB - Fence Replacement
Alteration
Post-Bid
$139,900 est. value
CA

Rio Cosumnes Correctional Center Honor Yard Fence Replacement
Alteration
Results
$486,500 est. value
Elk Grove, Sacramento, CA 95757

Replace Right of Way Fence
Infrastructure
Sub-Bidding
$97,400 CJ est. value
Merced, CA 95340

California Highway Patrol Redwood City Area Office - Fence Upgrade Services
Term Contract
Post-Bid
Redwood City, CA 94063

2021-22 Equestrian Trail Fencing
Alteration
Results
Norco, CA 92860

Arlington Stadium Security Fencing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Riverside, CA 92503

Replace Hyde Street Pier Gate
Demolition, Alteration
Post-Bid
$25,000 to $100,000 est. value
San Francisco, CA 94109

Santa Fe Union Park Fence
Alteration
Results
Richmond, CA 94804

Last Updated 09/28/2022 11:49 AM
Project Title

SJC Perimeter Protection Project - Rebid

Physical Address View project details and contacts
City, State (County) San Jose, CA 95113   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

T he Project generally involves the installation, integration, operation, and testing of new security technologies at SJC. The new security technologies include video cameras, lasers, radars, and sensors. The Project's scope is also inclusive of upgrade to SJC's fenceline and pedestrian gate(s) including the replacement of vehicle gate(s) with new mechanical speed gate(s). ach bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% the total aggregate amount of the bid. Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. Bidders must have a California contractor's license, classification A to bid this project. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Goals for minority participation for each trade: 19.6% Goals for female participation in each trade: 6.9% Under the DBE program, the City has established an overall DBE participation goal of 4.1% for the Airport for Federal Fiscal Years 2020-2022. The City is committed to meeting its overall DBE participation goal from 100% race-neutral participation and 0% through race-conscious measures (contract goals). No contract goal has been established for this procurement and no demonstration of good faith efforts is required. Question Deadline 09/22/2022 03:00:00 PM PT

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents