Similar Projects
Hess Sanitary Sewer Pump Station Rehabilitation Project
Renovation
Bidding
Hamilton Township, NJ

2021 Sewer Pump Station Maintenance
Term Contract
Bidding
Somers Point, NJ

Garden Street Pump Station Upgrade
Renovation
Sub-Bidding
$1,500,000 est. value
Mount Holly, NJ 08060

Sumner Avenue Pump Station Upgrades
Post-Bid
Union, NJ

Pump Station Maintenance
Term Contract
Post-Bid
Teterboro, NJ 07608

Clean Lift Stations and Catch Basins
Results
Trenton, NJ 08641

Upper Manasquan Pump Station Raw Sewage Pump Rebuilding
Results
Howell, NJ

2021 Proposal Influent Grinders for Wastewater Stations
Term Contract
Bidding
Somers Point, NJ

Various Pump Station Upgrades
Post-Bid
Freehold, NJ 07728

Pump Station Upgrades
Results
Brielle, Manasquan, Wall, NJ

Water Pollution Control Facility Effluent Pump Station Upgrades
Post-Bid
Livingston, NJ

Vincent Place Pumping Station Gear Drive Replacement
Results
Teterboro, NJ 07608

Oakland Drive West Sanitary Sewer Pump Station Upgrade
Post-Bid
Readington, NJ 08870

Utility Pump Station Maintenance and Repair
Results
Monmouth Junction, NJ

Emergency Pump Station Repairs
Post-Bid
Pennsauken, NJ 08109

Last Updated 03/02/2020 03:10 PM
Project Title

Clay Street Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Riverside, NJ 08075   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removal of the existing below grade steel 'can' type dry well and concrete sister well including associated equipment; rehabilitation of the interior of the existing concrete wet well; installation of a slip-in fiberglass wet well with two (2) submersible pumps on guide rails, a sewage comminutor on guide rails, an odor control system, and construction of a valve chamber with bypass connection. Also included is the installation of new pump station control panels and all associated electrical controls and wiring; and all other associated work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents