Similar Projects
UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Precast Stormwater Box
Results
Less than $7,000 est. value
Riverton, UT

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Lone Peak Parkway - 12000 South Culvert Extension
Results
Less than $300,000 est. value
Draper, UT 84020

Segmented Pipe Liner
Term Contract
Post-Bid
UT

2550 South 7200 West to 8000 West Surcharge and Culvert Package
Results
$2,800,000 to $3,500,000 est. value
Salt Lake City, UT 84190

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Road and Drainage Improvements - Central Avenue
Results
$300,000 to $400,000 est. value
Millcreek, UT 84107

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

Anna Caroline Drive Bridge
Results
Less than $443,240 est. value
West Valley City, UT 84119

I-80; Culvert Rehabilitation
Post-Bid
$500,000 to $1,500,000 est. value

Last Updated 08/18/2020 11:31 AM
Project Title

Strawberry River Restoration

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide soil lift/erosion control fabric installation, installation of beaver dam analogs, riparian plantings, and seeding of disturbed areas for the Strawberry River Mitigation Project along the Upper Strawberry River. Approximately 1.5 miles upstream (North) of the U.S. Highway 40 crossing of the Strawberry River (NW of Strawberry Reservoir). Project area access preferred route via Forest Road 384 which dead ends at the downstream extent of the project site. Access via other Forest Roads impaired by cultural resources. Approximate UTM Zone 12 of downstream extent, 480309.00 m E, 4461295.00 m N.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents