Similar Projects
Community Center Expansion - Warriors of Hope Addition
Addition - 2,150 SF
Post-Bid
$500,000 est. value
Grand Ronde, OR

Municipal Golf Course Clubhouse Renovation Contractor Services
Renovation
Post-Bid
$623,590 est. value
Lake Oswego, OR 97034

Design Build - Multi-Use Facility
New Construction
Bidding
$1,750,000 est. value
Eugene, OR

Oregon Parks And Recreation Facility Improvement Projects
New Construction
Conception
Salem, OR

Hub City Village
New Construction - 9,300 SF
Design
$2,400,000 est. value
Albany, OR

Silver Falls State Park Camping Expansion & North Falls Complex
New Construction
Conception
Silverton, OR 97381

Smith Rock STate PArk Visitor Center & Congestion
New Construction
Conception
Terrebonne, OR 97760

Robinwood Station Remodel
Renovation
Results
West Linn, OR 97068

New Parks & Recreation Facility
New Construction
Conception
$30,000,000 est. value
Corvallis, OR

Last Updated 07/22/2022 05:04 PM
Project Title

RFP D/B - Deschutes County Fair and Expo Center HVAC Controls Upgrade Project

Physical Address View project details and contacts
City, State (County) Redmond, OR 97756   (Deschutes County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Implement Energy Trust energy saving protocols to modernize Deschutes County Expo Center buildings: High Desert Activity Center, Middle Sister, South Sister, North Sister, Administration, and Maintenance buildings. Maintain building use to the largest extent possible during the project Maintain a safe environment for building users (public and private) for the duration of the project. Provide Turn-Key installation service of the entire project and associated scope of work. Provide one-year full parts and labor warranty coverage. Provide customer hands-on training at conclusion of project. HVAC controls upgrade in North Sister, Middle Sister, South Sister, Administration, and Maintenance. Replace existing Staefa controls with current DDC system and networking. Energy savings and incentives will be attributed to: Scheduling, High OAT Boiler Lockout, and Static Pressure Reset Install VFD retrofits on AC-1 (HDAC), AC-2 (North Sister), RTU-1 (Middle Sister), RTU-3 & RTU-4 (South Sister). EEM2 expands on EEM1 by adding optional VFD retrofits on existing constant volume RTUs. Last Day for Questions - July 7, 2022 Since this project is for a public work, it is subject to the state prevailing wage rates of wage under ORS 279C.800 to 279C.870. No bid will be received or considered by Owner unless the bid contains a statement by the bidder that the bidder will comply with provisions of ORS 279C.838 & 279C.840, Payment of prevailing rate of wage; posting of rates and fringe benefit plan provisions. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120. Owner may reject any bid not in compliance with all prescribed procedures and requirements and may reject for good cause any or all bids upon a finding of Owner that it is in the public interest to do so. NOTE: All proposals submitted in response to this RFP shall become the property of Deschutes County and may be utilized in any manner and for any purpose by Deschutes County. Be advised that the proposals and all documents submitted in response to this RFP are subject to public disclosure as required by applicable state and/or federal laws. If you intend to submit any information with your proposal which you believe is confidential, proprietary, or otherwise protected from public disclosure (trade secret, etc.), you must separately submit and clearly identify all such material. The cover page of the separate document must be red, and the header or footer for each page must provide as follows: Not Subject to Public Disclosure.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents