Similar Projects
Argentine Street Commercial Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Georgetown, CO 80444

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Crack Sealing Project
Infrastructure
Results
Less than $45,000 est. value
Dumont, CO

Frost Heave Repair - Witter Gulch Road
Infrastructure
Results
Dumont, CO

Mighty Argo - Argo Landing
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Idaho Springs, CO 80452

Mighty Argo - Argo Landing
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Idaho Springs, CO 80452

Eisenhower/Johnson Memorial Tunnel (EJMT) Consolidation Grouting and Structural Repair Project
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Georgetown, CO 80444

2022 Crack Sealing Program
Infrastructure
Results
Dumont, CO 80436

John Tomay Library Reconstruction
Addition, Demolition, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, CO 80444

Public Works Facility
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Idaho Springs, CO 80452

Pavement Marking Services
Infrastructure
Results
Dumont, CO

Circle K Stores / Georgetown
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Georgetown, CO 80444

Region 3 PS I-70 West Vail Pass Auxiliary Lanes - Colorado Department of Transportation
Term Contract
Post-Bid
$170,000,000 CJ est. value
Georgetown, CO 80444

Griffith Twelve
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Georgetown, CO 80444

Last Updated 05/31/2023 06:04 AM
Project Title

Gold Mountain and Virginia Canyon/Spring Street Pedestrian Connection

Physical Address View project details and contacts
City, State (County) Idaho Springs, CO 80452   (Clear Creek County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Apartments/Condominiums, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000315986 The City of Central is seeking proposals for the Gold Mountain and Virginia Canyon/Spring Street Pedestrian Connection (the “Project”). The Project, connecting Gold Mountain Village Apartments at 440 Powder Run Drive to Virginia Canyon Road and Spring Street, is one of three priority projects outlined in the Central City Trails Master Plan. The trail connection will generally follow an existing water pipeline corridor from the apartments to Virginia Canyon & Spring Street, along a city water easement. It will be approximately 0.2 miles long and will allow for pedestrian uses. Given the steep grade, a majority of the trail will comprise a timber stairway with nine (9) specific design elements, related to the memorial nature of the trail. To connect to Spring Street, there will be one road crossing at Virginia Canyon Road with a crosswalk and signage. The Project will include construction services. Question Acceptance Deadline 8 May 2023 5 PM

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents