Similar Projects
Vilonia Waterworks Association Mount Vernon Pump Station
Infrastructure
Bidding
$250,000 CJ est. value
Vilonia, AR 72173

Harkrider Sidewalk Improvements
Infrastructure
Post-Bid
$452,000 est. value
AR 72032

Little Rock AR Station Employee Lot Improvements
Term Contract
Post-Bid

Markham Street Jump Start Improvements Phase 2
Infrastructure
Results
$1,980,000 to $2,310,000 est. value
Conway, AR 72034

Vilonia Church St. Sidewalks
Infrastructure
Results
$1,675,490 CJ est. value
Vilonia, AR 72173

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

Donaghey Avenue Multi Family Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Conway, AR 72034

Dry Bores for Conway Corporation
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR

Runway 4-22 Rehabilitation (Joints and Markings)
Infrastructure
Results
$345,657 CJ est. value
Conway, AR 72034

The Bird's Nest Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Conway, AR 72034

Harkrider Water Line Replacement Phase 2
Infrastructure
Post-Bid
$426,000 est. value
Conway, AR 72032

1600 Place PUD
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Conway, AR 72032

Connecting Hallways/Safe Areas at Elementary School
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Enola, AR 72047

Donnell Ridge Pump Station Coating Repair
Infrastructure
Post-Bid
Conway, AR 72034

Conway Fire Station 03
New Construction, Infrastructure - 4,100 SF
Post-Bid
$500,000 CJ est. value
Conway, AR 72032

Last Updated 06/07/2023 11:41 AM
Project Title

Garrett Road Improvements

Physical Address View project details and contacts
City, State (County) Greenbrier, AR 72058   (Faulkner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,625,413 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, 1550 L.F. of roadside improvements including: notching and widening Garrett Rd., 2644 L.F. of new curb and gutter, 1579 L.F. of R.C. pipe for new storm sewer system, 622 S.Y. of new sidewalk, and other miscellaneous construction, as shown on the plans and indicated in the specifications. No pre-bid meeting will be held for this project. Site Directions: From I-40, travel north on Hwy. 65 for 9 miles and turn left on Hwy. 25. Travel west on Hwy. 25 for 0.8 miles and then turn right onto Garrett Road. This is the beginning of the project. The estimated cost range on this project is between $1,300,000 - $1,800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents