Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Greenway Maintenance as Needed
Infrastructure
Post-Bid
GA

Gravel Parking Lot Maintenance
Term Contract
Post-Bid
Cumming, GA

Sidewalk Project on Mcfarland and Shiloh Road
Results
GA

Old Atlanta Highway Phase 4 and 5
Results
Cumming, GA

Burger King
Renovation
Post-Bid
Cumming, GA 30040

Pedestrian Scramble at Milton Avenue and Canton/Roswell Street
Results
Alpharetta, GA

Construction of 10 New ADA Parking Spaces at Forsyth County Courthouse
Infrastructure
Results
Cumming, GA 30040

Big Creek Greenway Phase 2 Rehab
Infrastructure
Results
Cumming, GA

Emergency Trail Repair Chattahoochee Pointe Park
Alteration
Results
Cumming, Suwanee, GA 30024

Trail Repairs As Needed
Term Contract
Results
GA

Big Creek Greenway Phase 5
Infrastructure
Results
$1,669,140 est. value
Cumming, GA 30040

FY2022 Sidewalk Repair and Replacement
Infrastructure
Results
Alpharetta, GA

Cumming Utilities Shop South Parking Lot - Grading, Curb, Drainage and Paving Project
Infrastructure
Results
$200,000 est. value
Cumming, GA 30040

Last Updated 07/22/2022 04:03 PM
Project Title

2022 Cumming City Center Outdoor Landscaping Maintenance

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Cumming Downtown Development Authority, hereinafter called The DDA is requesting proposals from qualified contractors for the Outdoor Landscaping Maintenance of the Cumming City Center. Questions regarding the project should be directed to Phil Higgins at the email address of phil.higgins@cityofcumming.net no later than (April 7th , 2022 at 4:00PM). Proposals are legal and binding upon submission. All proposals to be submitted in duplicate. Any Proposal received after this date and time, will not be accepted.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents