Similar Projects
Windle Lane Stormwater Pond
Post-Bid
Daytona Beach, FL 32100

Blue Springs (Bank Stabilization)
Post-Bid
$550,000 est. value
FL

Roadway Repair
Results
Less than $350,000 est. value
FL

Bethune Point Shoreline Stabilization
Results
$300,000 to $350,000 est. value
Daytona Beach, FL 32100

Drainage Repair
Results
Less than $400,000 est. value

Sweetwater Hills Drainage Improvements
Results
Less than $200,000 est. value
Port Orange, FL 32129

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Deltona High School - Bus Loop and Drainage Renovations
Results
Less than $123,789 est. value
Deltona, FL 32725

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Riverfront Park Seawall Replacement
Results
Less than $3,326,655 est. value
Daytona Beach, FL 32100

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Drainage Repair
Results
Less than $1,300,000 est. value
FL

Drainage Repair
Results
Less than $300,000 est. value
FL

49 Lantana Drive Drainage Improvements
Results
DeBary, FL

Corrugated Pipe
Results
Less than $10,140 est. value
Ormond Beach, FL 32174

Last Updated 09/03/2020 08:36 AM
Project Title

Flomich Street and Riverside Drive Storm Outfall Replacement

Physical Address View project details and contacts
City, State (County) Holly Hill, FL 32117   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of a 36" damaged storm outfall at Flomich street and Riverside drive as well as installation of a seawall and storm inlets.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents