Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Grayson Repowering Project - Demolition and Site Improvement
Demolition, Infrastructure
Bidding
$100,000,000 CJ est. value
Glendale, CA 91201

Davenport Park Phase II - Park Expansion
Infrastructure
Bidding
$4,989,950 CJ est. value
Long Beach, CA 90805

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

S208--Irrigation System Repair
Alteration
Post-Bid
Los Angeles, CA 90073

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

C Line (Green) Extension To Torrance - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Torrance, CA 90503

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
West Hollywood, CA 90046

Pomona Water Reclamation Plant Primary Structures Concrete Lining and Biotrickling Filters
Renovation, Infrastructure
Bidding
$19,956,100 CJ est. value
Pomona, CA 91766

Last Updated 12/08/2022 04:25 AM
Project Title

Arroyo Seco Trunk Sewer Rehabilitation Phase 1

Physical Address View project details and contacts
City, State (County) Alhambra, CA 91801   (Los Angeles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,793,129 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ARROYO SECO TRUNK SEWER REHABILITATION PHASE 1, located in the Cities of Alhambra, San Marino, and South Pasadena, California. The work consists of rehabilitation of approximately 4,843 feet of existing 15- to 30-inch non-reinforced concrete pipe (NRCP), reinforced concrete pipe (RCP), cast iron pipe (CIP), and vitrified clay pipe (VCP) on the Arroyo Seco Trunk Sewer Sections 2, 3 & 5 and Chapel Avenue Trunk Sewer Sections 1 and 3 with cured in place (CIPP) liner and rehabilitate twenty-eight (28) adjacent manholes. This project will also remove approximately 2,234 feet of 16- to 18-inch VCP and CIP sewer on the Arroyo Seco Trunk Sewer Section 5 from service, and all appurtenant work. Each bid shall be submitted electronically and must be accompanied by a certified check, cashier's check, or bid bond with an approved surety company as surety, payable to Los Angeles County Sanitation District No. 16 Bonds for the faithful performance of the contract and for the payment of laborers and materialmen that are issued by suretiesthat are listed in the latest version of the U.S. Department of Treasury Circular 570 and that are authorized to issue bonds in the State of California, and whose bonding limitation shown in the circular is sufficient to provide bonds in the amount of the contract, will be deemed approved unless specifically rejected. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 150 WORKING DAYS after the date in the Notice to Proceed. Approximately: $1,100,000-$1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents