Similar Projects
Roofing Repair and Maintenance
Post-Bid

Mccarthy Teszler Roof Replacement/Repairs
Results
$500,000 to $600,000 est. value
Spartanburg, SC 29307

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

District 3 Roof Replacements
Results
Cowpens, Pacolet, Spartanburg, SC 29307

SCC - Jack A. Powers Building "C" Wing Reroofing Construction Project
Post-Bid
$275,000 to $350,000 est. value
Spartanburg, SC 29303

Cleveland Academy Of Leadership Roof Replacement And Select Exterior Wall Sealant Replacement
Results
SC

Owner Occupied Housing Roof Rehabilitation
Bidding
Spartanburg, SC

Re-Roof Section of Boiling Springs High School Freshman Academy
Results
Boiling Springs, SC 29316

Spartanburg - Tyger River 86 Warehouse Reroofing Phase II
Results
$124,900 est. value
Duncan, SC 29349

Dwelling Unit and Non-Dwelling Unit Improvements (Re-Roofing)
Post-Bid
Blacksburg, Calhoun Falls, Central, Chesnee, Fountain Inn, Inman, Landrum, McCormick, Pacolet, Pendleton, Seneca, Whitmire, York, SC

Roofing Envelope Services
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Upstate-Administration Building Gutter Replacement and Roof Repair
Results
$91,272 est. value
Spartanburg, SC 29303

Spartanburg School District 6 Roofing Project
Results
Roebuck, SC 29376

Roofing MACC
Post-Bid

Last Updated 10/01/2020 02:08 PM
Project Title

Removal and Replacement of HVAC System

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29304   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install the following equipment and materials: 1. Removal of existing 10-ton gas pack HVAC system. 2. Provide and install new 10-ton gas pack HVAC system with economizer and required ductwork, condensate line and wiring modifications which includes a new disconnect at unit. (use existing curb) 3. Visual inspection of existing duct system with minor repair included if required. 4. Full charge of R-410A refrigerant. 5. Crane. 6. Permit 7. Complete installation and start-up. 8. Complete cleanup of area after installation

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents