Similar Projects
Pump Repair and Maintenance Services
Bidding
Tucson, AZ

Construction Manager at Risk Services - Well 20 Improvement - Market Place
Bidding
Tempe, AZ

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Fuel Pump Dispenser Replacement
Post-Bid
Tucson, AZ

Z--Yuma - 242 Well Expansion
Results
$1,000,000 to $5,000,000 est. value
Yuma, AZ 85364

Y--Construct a Secondary Water Well at Temple Bar, La
Results
$250,000 to $500,000 est. value
AZ

Fuel Pump Maintenance & Repairs at Grand Canyon NP
Post-Bid
Grand Canyon, AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Watson Wash Well Abandonment
Post-Bid
Phoenix, AZ

Clean Evaluate Well
Results
Glendale, AZ 85309

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Valentine Well
Results
Phoenix, AZ 85027

Carrizo Production Wells
Post-Bid
$100,000 to $250,000 est. value
Fort Apache, AZ

Irrigation Pump Replacement
Results
Lake Havasu City, AZ 86406

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Reported 09/26/2020 12:00 AM
Project Title

F--Bodaway-Gap Well Installation

Physical Address View project details and contacts
City, State (County) Tuba City, AZ   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000 to $300,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Reclamation, Lower Colorado Region, is contemplating a project for the installation of and equipping of a pump, motor and pitless unit for the Bodaway-Gap Well. The Bodaway-Gap Supply Well Project will install a new water supply well within the Coppermine proposed wellfield. a. Supply and Equipping Well Pump and Motor. Contractor will supply and install a new submersible pump and motor for the Bodaway-Gap Well. The pump shall be capable of pumping at rate of 160 gpm with a total dynamic head (TDH) of 536 feet. b. Supply and Installation of a Baker Monitor Pitless Unit. Contractor shall supply and install a Baker Monitor Pitless unit for an 8-inch well casing per Standard Drawing No. W-30. Installation shall include the connection of up to 10 feet of 4-inch galvanized pipe for extension to well house. Contractor shall chlorinate and flush the well upon completion of pump/motor and pitless unit.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents