Similar Projects
Douglas Park Fire Station #5 - Restoration Phase One
Renovation, Alteration
Bidding
Rock Island, IL 61201

Exterior Door Hardware and 504 Improvements
Alteration
Bidding
Less than $174,000 est. value
Winchester, IL

DHS SP - FY21 Window and Door Repair - Shapiro
Term Contract
Post-Bid
Kankakee, IL 60901

Overhead Garage Door Replacement and Repair D2-D9 DL
Term Contract
Post-Bid

Naperville METRA 4th Avenue Entry Doors & Vestibules
Results
Naperville, IL 60540

Kinzie ES Locker Removal and Replacement
Results
Chicago, IL 60602

Door Replacement
Construction
Ullin, IL

Advanced Technology Center Doors, Frames, Hardware
Alteration
Bidding
Grayslake, IL

Window Shades at Brentano ES
Post-Bid
Chicago, IL 60602

Harrison Homes Storm Door Purchase & Installation Phase II
Results
Peoria, IL 61605

Haugan Entrance Door Replacement
Alteration
Bidding
Chicago, IL

Furnish and Deliver Steel Doors, Door Frames and Door Hardware
Post-Bid
Chicago, IL 60661

Harrison Homes Window Caulking & Door Insulation
Results
Peoria, IL 61605

Quincy Central Fire Station Window Removal and Replacement
Alteration
Bidding
Quincy, IL 62301

IFB 18-0119R Replacement Door and Hardware
Term Contract
Post-Bid
Downers Grove, Lisle, IL 60515

Reported 08/21/2021 12:00 AM
Project Title

Porch Build, Door, Window

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove two basement windows on the west side of house. Install new basement sliders in opening using mortar to old block. Making sure to pitch the bottom sill away from window unit. Remove basement door and threshold. Pour a concrete cap over the hollow blocks with a slope away inside. Install new pre-hung steel door. Support back porch roof and remove concrete cap and block walls. Dig new post piers under the roof beam and pour with concrete. Frame a wood deck with treated lumber, using 6x6 post to hold deck and roof up. Install soffit and facia on outside of overhang. Install gutters and downspouts on that porch only.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents