Last Updated | 04/21/2023 10:18 AM |
Project Title | Cook Hill Tank Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Montville, CT 06382 (New London County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,040,250 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 21,2023, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Montville will be accepting sealed bids for the Cook Hill Tank Replacement Project In general, the work consists of construction of a glass-fused-to-steel water storage tank and trihalomethane (THM) reduction equipment and associated electrical equipment adjacent to the existing Cook Hill Water Storage Tank, approximately 60-ft of water main to connect to the existing system, a 30 KW diesel standby generator, and a new electrical service. Construction of a glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank and approximately 30-ft of water main to connect to the existing system. MBE 6.0 percent ; WBE 2.5 percent The Work will be substantially complete within 245 days ; Final completion- 275 days Work Included: Construction of a new glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank. The major proposed work under this Contract includes: 1. Construction of the new 531,200-gallon water storage tank will include, but is not limited to: a. Excavation and installation of a new tank foundation; b. Construction of a glass-fused-to-steel water storage tank; c. Installation of an internal tank mixer, surface aerator and roof-top blower for ventilation of the air space; d. Installation of a new 3-phase electrical service; e. Installation of a new standby generator; f. Installation of an electrical enclosure for SCADA equipment; g. Installation of an electrical/control enclosure for the tank mixer, surface aerator, and roof-top blower; h. Connection of SCADA equipment enclosure to the existing antennas; i. Installation of 12-in water main and hydrant connecting the existing system to the new tank; j. Draining of existing water storage tank and disconnection from the water distribution system; k. Site work, including installation of a tank overflow channel and detention basin; l. Replacement of the existing chain link fence; m. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. n. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing chain link fence; b. Existing tank overflow channel; c. Piping and conduit, as indicated on the Drawings. 3. Maintain system flow processes as detailed in Part 3 of this section Addendum #1 has been issued as of 3-6-2023. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |