Similar Projects
Spot Safety - D04 PSIP Phase 2
Bidding
Akron, Canton, Youngstown, OH

Microsurfacing- MAH/TRU MCRO FY2022
Bidding

TH 198B and D GP Easterly Road
Post-Bid
West Farmington, OH 44491

TH 195C Durst Colebrook Road Widening and Resurfacing Phase 3
Post-Bid
North Bloomfield, OH 44450

West Wood Street Improvements Project
Results
$240,000 est. value
Lowellville, OH 44436

Bandy Road “Trailstar” Road Improvements
Results
Less than $176,724 est. value
Youngstown, OH 44500

Intersection - TRU-SR 46-06.50
Bidding
Niles, OH 44446

TRU - Phoenix Road Improvements
Post-Bid
Warren, OH

Four Lane Resurfacing - US 422-00.00
Results
OH

2021 Drive Improvements
Bidding
$260,500 est. value
Canfield, OH

TRU - CH 142 - North River Road
Post-Bid
Warren, OH 44481

Two Lane Resurfacing - US 422/SR 193-17.53/06.78
Results
Niles, OH 44446

Curb Ramp Replacement 2021 – Yankee Trace
Bidding
$296,700 est. value
Yankee Lake, OH

Austintown Township Resurfacing and Improvements Project
Post-Bid
Austintown, Youngstown, OH 44515

Two Lane Resurfacing - SR 5/SR 88-20.10/14.01
Results
OH

Last Updated 05/28/2020 08:18 AM
Project Title

Repairs and Resurfacing

Physical Address View project details and contacts
City, State (County) (Mahoning, Trumbull Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Part A: Removal by milling of two (2) inches of existing asphalt pavement in the center and right lanes of the mainline for Plan specified limits, removal by milling of five (5) inches of existing asphalt pavement in the right lane for Plan specified limits, resurfacing of the pavement to the thickness specified in the Drawings, various full depth pavement repairs, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, and temporary traffic control, in both Eastbound and Westbound lanes and all other items incidental to the completion of the Work. Part B: Removal by milling of three (3) inches of existing asphalt pavement on the interchange pavement and shoulders, resurfacing of the interchange pavement and shoulders to the thickness specified in the Drawings, full depth concrete pavement repairs of portions of interchange ramp pavement, installation of raised pavement markers and permanent pavement striping and/or other pavement markings, upgrading of guardrail, temporary traffic and all other items incidental to the completion of the Work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents