Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO

Asphalt Pavement Maintenance Contract
Term Contract
Bidding

2022 Paving Project
Infrastructure
Bidding
Federal Heights, CO

Design-Build Services I-70/Picadilly Interchange
Post-Bid
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Sport Court Resurfacing
Term Contract
Post-Bid
Thornton, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

2020 Concrete Pavement Preservation Program
Term Contract
Results
$1,500,000 to $1,600,000 est. value
Aurora, CO

Cape Seal Pavement Preservation
Infrastructure
Bidding
$400,000 est. value
Brighton, CO 80602

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Gateway Center Filing 7 Phases 1 and 2
Post-Bid
Denver, CO 80239

Polyester Concrete Overlay On Three Structures
Results
$1,000,000 to $5,000,000 est. value
CO

PKAA, BPMD Campground 7 Project
New Construction
Post-Bid
$30,000 to $37,000 est. value
Denver, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Construction of 38th Parkway at the Aurora Highlands
Infrastructure
Post-Bid
Aurora, CO

Reported 04/08/2022 12:00 AM
Project Title

Asphalt Repairs and Replacement Services

Physical Address View project details and contacts
City, State (County) Westminster, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt work (repairs and replacement) for a one year period with up to four 1-yr renewal options. Specific Requirements: Asphalt Work services to include: RR HMA SX PG 64 – 22-5/8 patching by Square Yard 1. 8” 2. 5” 3. 4” 4. 2” 2” Overlay with Patromat by Square Yard Infrared Patching – 5” Thick by Square Yard 1. Add new asphalt 2. Compact with vibrating roller 3. Clean up process 4. Clean the damaged Areas of all dirt and debris 5. Heat the asphalt to a working temp of 300° F by the infrared process 6. Rake heated area to a depth of 2” and remove any infrared material Crack Seal by Linear feet 1. Clean and fill cracks with Vance Brothers #3405 Hot Pour Rubberized Crack Sealer 2. Transition crack seal (concrete to asphalt) joint will be sealed 3. All cracks ¼” or greater will be sealed unless otherwise specified Seal Coat by Square Feet 1. Pavement sealer (two full coats) 2. Existing pavement will be cleaned and oil spots will be primed where applicable 1. To include Striping (re-striping) 2. Parking Lot/Play Pad as existing lay out (unless otherwisespecified) 3. Water base / traffic paint “white, yellow, red, blue” Any and all additional charges and fees must be included in the proposal; no additional fees or charges will be accepted after the fact. PMM - Polymer Modified Master / Seal applied at 58-62% solids The Contractor shall furnish all labor, equipment, vehicles and other items necessary to complete the project. The Contractor shall be responsible for: Installation complying with manufacturers recommended products and procedures; all work must be completed in a professional manor and meet all local and state statutes. Contractor must fence off or block the work zone during project. Building security and public safety within the work area is required. Children may be present. Please use extra precautions to provide a safe environment at all times. The School District’s authorized representative(s) shall, at all times, have access to the work whenever it is in preparation or progress. These District representatives reserve the right to reject, or require the correction, of any materials or workmanship that, in their opinion, fails to meet specifications or industry standards. An rejected materials shall be promptly removed from the site by the vendor or his representative. Warranty period shall be a minimum of 1 year for all work performed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents