Similar Projects
HVAC System at Manaugh Elementary
Post-Bid
Cortez, CO 81321

Districtwide Refrigeration Maintenance and Repair Services
Post-Bid
CO

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Heat Exchanger Tube Bundles
Results

2019-053M19 Refurb HVAC System B Building CMHIFL
Post-Bid
Less than $981,000 est. value
Denver, CO

Chiller Replacement - Winograd K-8
Results
Less than $100,000 est. value
Greeley, CO 80634

Furnace Replacements Services
Term Contract
Post-Bid
Pueblo, CO

Broomfield Roof Top Unit RTU Replacements
Results
Broomfield, CO 80021

Animal Control Community Center Duct Cleaning
Post-Bid
CO

AEROCOOL - Commercial Evaporative Cooler Package
Results
Pueblo, CO

STRiVE Wood Shop - Swamp Cooler Replacements (4)
Renovation
Post-Bid
Grand Junction, CO 81501

HVAC Upgrades Building 753
Results
Denver, CO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Air Units
Results
Less than $43,000 est. value
Delta, CO 81416

HVAC Protective Monitoring
Term Contract
Post-Bid
Longmont, CO 80501

Last Updated 08/29/2022 05:11 PM
Project Title

Upgrade HVAC & Control Systems, Lowell Heiny Hall

Physical Address View project details and contacts
City, State (County) Grand Junction, CO 81501   (Mesa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $887,348 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Colorado Mesa University (CMU) is seeking submittals from qualified contractors to complete HVAC and Control upgrades in Lowell Heiny Hall (LHH), the main administrative building on the Grand Junction campus. Scope of work includes 2nd and 3rd floors of Lowell Heiny Hall. The selected contractor will be required to demo the existing (118) 4-pipe fan coils and replace with one-for-one fashion with new hot water and chilled water 4-pipe fan coils. Each new fan coilwill require wireless room thermostat sensors along with new 3-way heating and chiller water control valves. The existing 8'' supply and 8'' return ductwork will be demolished and shall be replaced with new. All plenum sections will be removed and newly installed Sheetmetal supply and return plenums installed. Existing outside air louvers will be maintained, but contractor must provide new balancing dampers on the existing outside air duct. All required condensate piping shall be upgraded and routed from new condensate pumps. All existing 120/1/60 electrical connections shall be maintained and will serve new fan coil units. Bid Intent Deadline 07/27/2022 01:00 PM EDT Question Acceptance Deadline 07/22/2022 01:00 PM EDT Questions are submitted online No Piggyback Contract No General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 %

Details

2 Stories Above Grade, Renovation, Renovation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents