Similar Projects
2021 Surface Repair Lockwood and Pullen Park Playground
Infrastructure
Bidding
Raleigh, NC 27610

Roadway Resurfacing
Infrastructure
Bidding
$2,900,000 est. value
Woodfin, NC

Kerners Mill Creek Greenway
Post-Bid
Less than $1,742,000 est. value
Kernersville, NC

Yard Asphalt Re-Surfacing and Expansion Project
Post-Bid
Southern Pines, NC

Grading, Drainage, Paving, and Safety Improvements
Results
NC

Blue Ridge Parkway Pavement Preservation - Asheville
Results
$1,000,000 to $5,000,000 est. value
Asheville, NC

Public Works - Street Maintenance Repairs 2022
Infrastructure
Bidding
Durham, NC

Asphalt Rejuvenating Service
Post-Bid
Raleigh, NC

Design-Bid-Build (DBB) Construction Project for P1346B/P1280B, Birch Street Road Improvements/Birch Street North at Marine Corps Base Camp Lejeune, North Carolina
Results
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC

Parking Lot Repair and Resurfacing at the North Carolina Judicial Center
Infrastructure
Bidding
Raleigh, NC

Downtown Improvements
Post-Bid
Cherryville, NC

Grading, Drainage, Paving and Structure
Results
NC

AST (Double Seal and Single Seal), Milling and Resurfacing of Various Secondary Routes
Infrastructure
Bidding

Grading and Paving of Berkley Avenue
Post-Bid
Kinston, NC 28504

Street Rejuvenation Project
Results
Less than $57,152 est. value
Garner, NC 27529

Last Updated 03/17/2022 04:00 AM
Project Title

Asphalt Surface Treatment

Physical Address View project details and contacts
City, State (County) NC   (Stanly County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0001 0000100000-n 800 Mobilization Lump Sum L.s. 0002 1803500000-e 660 Asphalt Surface Treatment,Double Seal 290,070Sy 0003 1838000000-e 660 Emulsion for Asphalt Surface 156,485 Treatment Gal 0004 1838500000-n 660 Vacuum Truck 5 Wk 0005 2143000000-e 818 Blotting Sand 15 Ton 0006 4413000000-e Sp Work Zone Advance/general 1,892 Warning Signing Sf 0007 4457000000-n Sp Temporary Traffic Control Lump Sum L.s.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents