Similar Projects
Summit at Halfmoon
New Construction - 147,200 SF
Conception
$26,000,000 est. value
Clifton Park, NY 12065

Enhance Pedestrian and Bike Facilities along Main Street - Town of Clifton Park
Infrastructure
Conception
$1,781,000 est. value
Clifton Park, NY

Playground Upgrades, Clement Park
Infrastructure
Design
$190,000 CJ est. value
Waterford, NY 12188

Sealcoating and Striping Parking Lots
Infrastructure
Bidding
$300,000 est. value
Greenfield Center, Middle Grove, Saratoga Springs, NY 12850

West Crescent Fire District - Addition Renovation - General Contruction
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Clifton Park, NY 12065

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Paving of Certain Village Streets
Post-Bid
Waterford, NY

Clifton Park Pedestrian Safety Improvements
Post-Bid
$368,400 est. value
Clifton Park, NY

World-Wide Water Storage Tank Remediation
Term Contract
Results

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Results
Less than $225,000 est. value
Round Lake, NY 12151

Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

West Crescent Fire District Addition and Renovation - Fire Protection
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Clifton Park, NY 12065

Sealcoating/Crack Sealing/Striping 2021
Infrastructure
Post-Bid
Stillwater, NY

Ballston Spa CSD 2018 - Parking Lot Improvements
Results
Less than $450,000 est. value
Ballston Spa, NY 12020

Last Updated 07/25/2022 02:31 PM
Project Title

Button Road Water Storage Tank Project - Contract 1G - General Construction

Physical Address View project details and contacts
City, State (County) Halfmoon, NY 12065   (Saratoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project work sites are located on Button Road and Lower Newtown Road in the Town of Halfmoon, New York. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: -- Construction of a 1,000,000-gallon elevated water storage tank and associated appurtenances including miscellaneous site work, grading, concrete foundation, foundation piles, tank erection, tank coating and disinfection, piping, altitude valve vault, fencing, paved access road and parking area, and erosion and sediment control measures. -- Open-cut installation of approximately 670 linear feet of 10-inch high density polyethylene water main to connect the proposed water storage tank to the existing water distribution system, including all associated piping, fittings, hydrants, valves, and the hydrostatic testing and disinfection of the water main. Each bid must be accompanied by a bid security in the amount of not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the Information to Bidders. The successful bidder will be required to furnish to the Town of Halfmoon an executed performance and completion bond in a form meeting the Town's approval, in an amount not less than 100% of the accepted bid as security for the faithful performance and completion of this contract, and also a separate bond guaranteeing prompt payment of monies due to all persons supplying the contractors or subcontractors with labor and materials employed and used in carrying out the contract, and having as surety on the bonds such surety companies as are approved or acceptable to the Town of Halfmoon. The Town of Halfmoon reserves the right to reject any or all bids. All work shall be subject to equal opportunity in employment, State wage rates and all other requirements in accordance with applicable law.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents