Similar Projects
RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Authentix North Range Apartments
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Commerce City, CO 80022

Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

Service Street Auto Repair / Broomfield
New Construction, Infrastructure - 4,556 SF
Bidding
$1,700,000 CJ est. value
Broomfield, CO 80020

2022 Water System Improvement
Post-Bid
Aurora, CO

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

On Call Construction Services II for Priority Repairs of Water, Wastewater and Stormwater Infrastructure
Results
Aurora, CO

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Lake Mary Trail Paving Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Commerce City, CO 80022

PKAA Bald Mountain Mine Closure Project
Post-Bid
Denver, CO

PKAA Chicago In Spring Mine Closure Project, 709N
Results
Less than $100,000 est. value
Denver, CO

RFP Construction Manager - Eagle Ridge Academy - CMGC Services
Addition, Demolition, Build-out, Infrastructure
Bidding
$300,000 CJ est. value
Brighton, CO 80601

Major Earthwork Land Development Construction Activities
Infrastructure
Post-Bid
Aurora, CO

Last Updated 07/28/2022 02:12 PM
Project Title

Custer Street Sanitary Sewer Bypass

Physical Address View project details and contacts
City, State (County) Bennett, CO 80102   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28 the project is expeted to be awarded sometimes next month.. The Town of Bennett is seeking to improve the Town's sanitary sewer collection system safety, capacity and efficiency for Town residents and business owners, by installing 3,000 feet of 12" sanitary sewer bypass or interceptor line on the east side of Town of Bennett, in Adams County, Colorado. The new sanitary sewer bypass will extend from Bennett Ave at Custer Street north across two Colorado State Highways and a Union Pacific main line rail and right-of-way, to 8th street, and then east along Washington Way. The bypass main will terminate and connect to an existing sanitary sewer main pipe stub located at Washington Way and Morgan Way, within the Bennett Ranch Development, east of the Bennett School District Campus. Notably, the Project will collect flows from the Bennett Upper Elementary School site, will take the Town's Shari's Court lift station out of service, and will dramatically reduce flows to the the Town's Cordella lift station. When completed, the project is expected to ultimately divert over 100,000 gallons per day of wastewater, at peak flows of up to 300 gpm, away from and around older, existing areas of Town of Bennett. Buyers Requirements General Requirements - Insurance Required - Contractors License Required Job Location Bennett Colorado Question Acceptance Deadline 06/02/2022 02:00 PM EDT Questions are submitted online Yes The Town of Bennett is seeking to improve the Town's sanitary sewer collection system safety, capacity and efficiency for Town residents and business owners, by installing 3,000 feet of 12-inch sanitary sewer bypass or interceptor line on the east side of the core Town of Bennett, in Adams County, Colorado. The new sanitary sewer bypass will extend from Bennett Avenue at Custer Street, north across two Colorado State Highways and a Union Pacific mainline rail and right-of-way, to 8 th Street, and then east along Washington Way. The bypass main will terminate and connect to an existing sanitary sewer main pipe stub located at Washington Way and Morgan Way, within the Bennett Ranch development, east of the Bennett School District campus. Notably, the Project will collect flows from the Bennett Upper Elementary School site, will take the Town's Shari's Court lift station out of service, and will dramatically reduce flows to the Town's Cordella lift station. When completed, the Project is expected to ultimately divert over 100,000 gallons per day of wastewater, at peak flows of up to 300 gallons per minute, away from and around older, existing areas of the core Town of Bennett. For the Town of Bennett Custer Street Sanitary Sewer Bypass project, Proposals shall be based on the posted or provided Terramax, Inc. Consulting & Engineering, construction plans of that same project title, dated 5/19/22, and noted as "FOR BID" on each sheet. The project construction plans consist of 11 total sheets, including the Cover and Index Sheet, General Notes including Specification reference, Site Plan, Sewer Plan and Profile Sheets, and Detail Sheets. General, approximate quantities and description of primary work items include the following: o 2,987 linear feet of 12-inch ASTM D-3034 SDR 35 sanitary sewer main; o 307 linear feet of 8-inch ASTM D-3034 SDR 35 sanitary sewer main; o 2 x 100 foot 24-inch x 0.375" steel casing pipe bores for two (2) CDOT crossings; o 1 x 200 foot 24-inch x 0.375" steel casing pipe bores for one (1) UPRR crossing; o Eleven (11) 60-inch diameter sanitary sewer manholes (without drop); o Four (4) 60-inch diameter sanitary sewer external-drop manholes; o One (1) 48-inch diameter sanitary sewer external-drop manholes; o 700 linear feet of concrete street demo and repair; and o 1,000 linear feet of asphalt street demo and repair. This primary work description and work item listing is provided for Project characterization, and is not intended to be comprehensive for all Project work required. Additional and accessory work items and materials are to be per Project plan and specification requirements, and are not necessarily shown above.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents