Similar Projects
King Street- Bradlee Roadway Improvements - City of Alexandria
Alteration
Conception
$2,215,000 est. value
Alexandria, VA 22350

Potomac Stage IV Transmission Facilities - Fairfax County
Alteration
Conception
$10,366,000 est. value
Vienna, VA

Dulles Toll Road Crossing at Innovation Center
Post-Bid
$5,300,000 est. value
Fairfax, VA

Provision and Installation of Water Mains - As Needed
Term Contract
Post-Bid
Vienna, VA

36-inch Prince William County Transmission Main, Phase II
Results
Fairfax, VA

Corbalis Water Treatment Plant Surge Relief Valve Replacement
Renovation
Results
Fairfax, Herndon, VA 20170

Water Main Installation and Service Contract
Term Contract, Infrastructure
Post-Bid
Fairfax, VA

Occoquan River Crossing Transmission Main
Infrastructure
Results
Fairfax, VA

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
McLean, VA 22101

Powhatan Street - 16" Transmission Main Project P2641, Division 001
Infrastructure
Results
Fairfax, VA

USACE HEC Fire Hydrant Replacement
Term Contract
Results
Alexandria, VA 22315

Mount Vernon Terrace Force Main Replacement Project
Alteration
Results
Alexandria, VA

Herndon Parkway Water Main Replacement Project
Infrastructure
Results
Herndon, VA

60" and 66" Butterfly Valves
Infrastructure
Results
Fairfax, VA

Large Displacement, Compound and Turbine Cold Water Meters
Term Contract
Results
Fairfax, VA

Last Updated 07/08/2022 05:27 AM
Project Title

Wastewater Linear Construction Job Order Contract

Physical Address View project details and contacts
City, State (County) Fairfax, VA   (Fairfax County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of multiple linear wastewater projects at various locations scheduled to take place over a period of five years from the Notice-to-Proceed date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents