Similar Projects
Last Updated | 05/08/2023 01:12 PM |
Project Title | State Route 73 at Corwin Road Forcemain Relocation Project Rebid |
Physical Address | View project details and contacts |
City, State (County) | Waynesville, OH 45068 (Warren County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $133,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Engineer's opinion of probable construction cost for the base bid work is $155,000.00 Questions regarding the technical specifications should be in writing and directed to Kathryn Gilbert at the Warren County Water and Sewer Department, Kathryn.Gilbert@co.warren.oh.us, (513) 695-1645. To be given consideration all questions must be received by 4:00 pm on Thursday, March 30, 2023. *The project generally consists of the construction of 175 linear feet of 10-inch forcemain. or The project generally consists of construction approximately 175 linear feet of 10-inch forcemain and temporary bypass pumping of the sanitary sewer forcemain. Questions regarding the technical specifications should be directed to Kathryn Gilbert in writing at the Warren County Water and Sewer Department, Kathryn.Gilbert@co.warren.oh.us, (513) 695-1645. Each bid shall contain the full name of each person or company submitting the bid and be accompanied by a bid bond for the full amount of the bid or a certified check in the amount equal to ten (10) percent of the bid. Contact the Warren County Commissioner's Office at (513) 695-1250 should you need assistance in accessing the bidding information on the County's site. All contract addenda will be posted to the site prior to the bid opening. Bidders should check the website regularly to stay updated on any changes to the project. Please be aware that if you are downloading this document to bid this project, and in order to stay updated on any change, please email Krystal Powell in the Commissioners' Office at krystal.powell@co.warren.oh.us with your contact information. The Board of Warren County Commissioners reserve the right to accept the lowest and best bid, to reject all bids, and to waive any irregularities in bids. Substantial Completion: 150 Days from Notice to Proceed. Final Completion: 180 Days from Notice to Proceed. The work for this contract is located in Warren County, Ohio and consists of the following: 1. Approximately 175 feet of 10-inch sanitary forcemain located along State Route 73 in Wayne Township, Warren County, Ohio. 2. Installation of two 10-inch temporary line stops and permanent plugs and blocking on the existing forcemain located along State Route 73 in Wayne Township, Warren County, Ohio. 3. Restoration of disturbed areas and pavement. 4.Site work including earthwork, dewatering, piping, paving, and restoration. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |