Similar Projects
Replacement of Activated Carbon in the Riverside Pump Station Odor Control System
Renovation
Bidding
$50,000 est. value
North Andover, MA

Construction Firm for the Purposes of Upgrades to Two Existing Sewer Ejector Stations
New Construction
Bidding
$300,000 est. value
Franklin, MA

Yarmouth Pump Station Improvements Project - Phase 2 - Sub Bid
Renovation
Sub-Bidding
$1,900,000 est. value
Yarmouth, MA

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Sewage Lift Station Replacement
Results
Less than $250,000 est. value
Boston, MA

Permanent COMM Connection Project
Results
$334,000 est. value
Hyannis, MA 02601

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Yarmouth Pump Station Improvements Project Phase 2 - General Bid
Renovation
Bidding
$1,900,000 est. value
West Yarmouth, MA

Rose Park Pump Station Upgrades - Filed Sub-Bids
Post-Bid
Less than $592,000 est. value
Pittsfield, MA 01201

Rose Park Pump Station Upgrades - General Bids
Results
$637,688 est. value
Pittsfield, MA 01201

Sewer Pump Station Maintenance and Repairs
Post-Bid
Lexington, MA

Fiske Hill Water Pump Station Construction Project - General Bids
Results
$730,000 est. value
Sturbridge, MA 01566

2020 Pump Station Improvements Project - General Bids
Post-Bid
$1,250,000 est. value
Weymouth, MA

South End Sewer Pump Station Replacement
Results
$3,400,000 est. value
Fall River, MA 02722

Last Updated 09/13/2021 09:34 AM
Project Title

Lincoln Ave and Jefferson Pump Station Upgrades - General Bids

Physical Address View project details and contacts
City, State (County) Holden, MA 01520   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Replacement of pumps, piping, valves, controls, drives, and associated mechanical and electrical work at two wastewater pumping stations.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents