Similar Projects
Intersections of IL 47 and Pine Bluff Road and at the Intersection of IL 47 and Southmor Road South of Morris
Infrastructure
Bidding
IL

0.7 MI of Mcclindon Rd in Channahon to 0.2 Mi W of Will Co Line
Infrastructure
Bidding
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Apply Emulsified Asphalt Seal Coat and Remark Runway 18-36
Results
Morris, IL

Construction of Storm Sewer Reconstruction
Infrastructure
Bidding
$500,000 est. value
Verona, IL

Seal Coat
Infrastructure
Post-Bid
Morris, IL

Valerio Road and Carbon Hill Road Fog Seal Coating
Results
Coal City, IL

HMA
Infrastructure
Post-Bid
Morris, IL

Perform Crack Filling Fiber Asphalt Operations on Various County
Results
Less than $140,070 est. value
IL

Crack Fill
Infrastructure
Post-Bid
Morris, IL

Supply - Haul and Spread Stone in Various Operations for Road
Results
Less than $78,875 est. value
IL

Cape Seal
Infrastructure
Post-Bid
Morris, IL

Perform A-1 Resurfacing and Cape Seal Operations
Results
Less than $309,379 est. value
IL

Last Updated 04/18/2022 01:10 AM
Project Title

2022 Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Gardner, IL 60424   (Grundy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $270,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of the existing hot mix asphalt pavement parking lot, preparation of existing aggregate base course, PCC sidewalk removal and replacement, storm sewer installation, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents