Similar Projects
Reported | 04/17/2021 12:00 AM |
Project Title | Water Purification System |
Physical Address | View project details and contacts |
City, State (County) | Pascagoula, MS 39567 (Jackson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall provide the following: Quantity 1 - Water Purification System with the following Technical Specifications: Produce type 1 - Ultrapure water for Liquid Chromatography/Triple Quadrupole- Mass Spectrometer (LC/QQQ-MS) and Inductively Coupled Plasma Mass Spectrometer (ICP/MS) analyses, (18.2 mega-ohm purity) Benchtop Unit Maximum Dimensions: 600mm (height) x 350 mm (width) x 350 mm (depth) Voltage Requirements: Input--AC 100 - 240 VAC, 50 - 60 Hz, 2.0 A Maximum Output--DC 24 V, 5.0 A Maximum Tank shall have a minimum capacity of 60L; Bacterial Content shall be: <0.01 CFU/mL, Feedwater Source: Tap Water, Flow Rate: Up to 1 L/min, and produce 10 liter per minute minimum purified water One-Year Warranty including all Parts and Labor. All attachments, accessories and a full starter kit of needed consumables shall be provided with the purchase of the Water Purification System; System must be Complete and ready to use upon installation Delivery and installation of the Water purification system to the 2nd floor of the NOAA Pascagoula, MS Facility. Installation Qualification/Operational Qualification (IQ/OQ) testing/diagnostics Service shall be provided and include a comprehensive document detailing all protocols successfully carried out to ensure the operational readiness of the platform for use. One-day, on-site Water purification system Familiarization Training for two analysts. NISL may utilize a virtual environment so other NISL analysts can attend the training. 4 option years Extended Preventative Maintenance that includes technical phone and email support during normal business hours; all Parts and Labor due to normal wear and usage and in accordance with Water Purification System manufacturers requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |