Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

SW Division Street Culvert Replacement Project (Rebid)
Infrastructure
Bidding
$800,000 CJ est. value
Aloha, OR 97007

Floor & Decor / Beaverton - Rebid
New Construction, Infrastructure - 72,062 SF
Bidding
$20,000,000 CJ est. value
Beaverton, OR 97005

RFP Engineering - Consulting Services for Design and Implementation Support for the District's Advanced Metering Infrastructure Project
Infrastructure
Post-Bid
$111,000 CJ est. value
Tigard, OR 97223

Beaverton High School Replacement - MEP (Mechanical, Electrical, Plumbing)
Demolition, New Construction, Infrastructure
Post-Bid
$210,800,000 CJ est. value
Beaverton, OR 97005

Norwood Pump Station
New Construction
Results
$1,000,000 est. value
Tualatin, OR 97062

ASR 3 and 2 Wellhouse Improvements
Renovation, Infrastructure
Results
$4,381,728 CJ est. value
Tigard, OR 97223

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Hall-Watson Loop Improvements - 5120 - City of Beaverton
Renovation, Infrastructure
Conception
$5,860,000 CJ est. value
Aloha, OR 97007

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Last Updated 03/15/2023 11:34 AM
Project Title

Hillsboro High Head Pump Station and Control Gate Modifications

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97124   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,833,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the High Head Pump Station including: 1. Demolition of the existing Raw Sewage/Reclaimed Water (RS/RWR), Irrigation, Plant Water, and Sump pumping systems. 2. Construct a new wet well within the existing structure. 3. Install new High Head Transfer, Plant Water, and Sump pumping systems. 4. Complete Effluent Pumping mechanical piping improvements. 5. Complete electrical and instrumentation work associated with the improvements. The Work is a public works project subject to ORS 279C.800 to 279C.870. Bidders must be qualified in accordance with the applicable parts of ORS 279C in order to submit a Bid for public work in Oregon. For questions regarding administrative issues, contact Owner: Stephen Waldron, 503.547.8134, waldrons@cleanwaterservices.org. For questions regarding technical issues, contact the Engineer: Karen Bill, 503.547.8132, billk@cleanwaterservices.org. The Work Site is located at Hillsboro Water Resource Recovery Facility, 770 S First Avenue, Hillsboro, Oregon 97123 (Site). The estimated construction cost of the Work is $5,700,000. Substantial Completion 550 calendar days Final Completion 595 calendar days RVT File- 10326936-00-S.rvt general: 1. In general, work includes, but is not necessarily limited to, excavation for structures and retaining walls, removal of underground obstructions and undesirable material, backfilling, filling, and fill, backfill, and subgrade compaction. 2. Obtain fill and backfill material necessary to produce grades required. a. Materials and source to be approved by Engineer. b. Excavated material approved by Engineer may also be used for fill and backfill. Removal of obstructions and undesirable materials in excavation includes, but is not necessarily limited to, removal of old foundations, existing construction, unsuitable subgrade soils, expansive type soils, and any other materials which may be concealed beneath present grade, as required to execute work indicated on Contract Drawings. a. If undesirable material and obstructions are encountered during excavation, remove material and replace as directed by Engineer. b. Remove unsuitable subgrade soils located below foundations. The bottom of the overexcavation shall be located outside the exterior limits of foundations around the perimeter of structure the following horizontal distance: 1) Distance equal to depth of overexcavation below bottom of foundations. c. When excavation has reached required subgrade elevations, notify Engineer, who will make an inspection of conditions

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents