Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

RFP Construction Manager at Risk - East Perry Wastewater Treatment Facility Phase I
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Perry, GA 31069

Building G Extension Expansion Central Georgia Technical College
Addition, Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Warner Robins, GA 31088

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Georgia Avenue Water Main Replacement
Results
$301,800 est. value
Perry, GA 31069

Water System Improvements Phase 1
Results
Elko, GA 31025

Dollar Tree / Warner Robbins
New Construction, Infrastructure - 12,000 SF
Bidding
$3,100,000 CJ est. value
Warner Robins, GA 31093

Water System Improvements Phase II to Serve Gilbert Road
Infrastructure
Post-Bid
$750,000 est. value
GA

Agriculture Meter Installation
Infrastructure
Results

RFQ Contractor - UHZ113000 Building 231 Second Story Addition
Addition, Demolition, Infrastructure - 20,654 SF
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Perry, GA 31069

Site Clearing Of Retention Ponds
Alteration
Results
Warner Robins, GA

Last Updated 09/26/2022 04:39 PM
Project Title

Water System Improvements Phase II to Serve Gilbert Road

Physical Address View project details and contacts
City, State (County) Elko, GA 31025   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Offeror agrees to furnish all materials and equipment and to perform all labor necessary to install +-7,200 LF of 12" PVC water main, +-500 LF of 12" Ductile Iron water main with restrained joints, fire hydrants, valves, fittings, and all related work. Time allotted for completion of Work is 90 consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Award of Contract: March 1, 2022 Notice to Proceed: November 1, 2022 Date of Substantial Completion:January 29, 2023 The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility Manager" certification holder who will have oversight of all the work. Therefore, the Contractor submitting a proposal must list the license number of the Contractor performing the utility contracting on the face of the proposal envelope and on the proposal. No proposal will be opened unless it contains the Contractor's Utility License Number on the envelope. Proposals shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful offerors if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. All anticipated Federal, State, and/or Local permits for this project have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed. All qualifying Contractors and Subcontractors performing work with the Houston County Board of Commissioners must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Proposal to be considered, it is mandatory that the Offeror's E-Verify number be listed on the outside of the Proposal envelope. All easement and right-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed. Any contract awarded under this Advertisement will be partially funded by the American Rescue Plan Act State Fiscal Recovery Fund Water and Sewer Infrastructure Award. Reference the ARPA-SFRF Conditions Supplement included in the contract documents for all applicable provisions. Owner reserves the right to reject any or all Proposals, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Proposals and to reject the Proposal of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror, whether because the Proposal is not responsive or the Offeror is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents