Similar Projects
Salamanca CSD Improvements - Phase 3.4
Design
Salamanca, NY 14779

2019 Capital Improvement Project - Phase 2 Re-bid Contract 203: General Trades
Renovation
Bidding
$500,000 CJ est. value
Ellicottville, NY 14731

2019 Capital Improvement Project - Phase 2 Re-bid Contract 203: General Trades
Renovation
Bidding
$500,000 CJ est. value
Ellicottville, NY 14731

Yorkshire-Pioneer CSD Reconstruction Project
Renovation
Post-Bid
$185,000 to $6,400,000 est. value
Yorkshire, NY

Yorkshire-Pioneer CSD Reconstruction Project
Renovation
Post-Bid
$185,000 to $6,400,000 est. value
Yorkshire, NY

Cattaraugus-Little Valley CSD - 2021 Emergency Project
Renovation
Results
Cattaraugus, NY 14719

Cattaraugus-Little Valley CSD - 2021 Emergency Project
Renovation
Results
Cattaraugus, NY 14719

Gowanda Central School District Capital Improvement Project - Phase 1B
Renovation
Construction
Less than $12,000,000 est. value
Gowanda, NY 14070

Allegany-Limestone CSD 2020 Capital Improvement Project
Renovation
Construction
Allegany, NY 14706

Franklinville CSD 2018 Capital Improvements Phase II
Renovation
Results
Less than $100,000 est. value
Franklinville, NY 14737

Gowanda CSD Capital Improvement Project - Phase 2
Renovation
Construction
$7,600,000 est. value
Gowanda, NY 14070

2021 Capital Improvement Project - Phase 1
Renovation
Results
Cattaraugus, NY 14719

Prospect Elementary School Additions and Alterations
Renovation, Addition
Results
Salamanca, NY 14779

Olean CSD Capital Improvements 2022
Renovation
Results
$600,000 to $7,300,000 est. value
Olean, NY 14760

West Valley Central School District 2021 Capital Improvement Project
Renovation, Addition
Results
$160,000 est. value
West Valley, NY 14171

Last Updated 08/22/2022 07:31 PM
Project Title

2019 Capital Improvement Project - PHASE 2-RE-BID

Physical Address View project details and contacts
City, State (County) Ellicottville, NY 14731   (Cattaraugus County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Parking Garage
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center - 08/04/22
Owner View project details and contacts
Architect View project details and contacts
Description

2019 Capital Improvement Project - Phase 2 Contract 204: Fuel Tank The Architect for the Project is: SEI Design Group, 224 Mill Street, Rochester, NY 14614. All RFI's should be directed to the Construction Manager, Campus Construction Management Group Inc., to the attention of Barry Church, Project Executive, (607) 342-5562, BChurch@ campuscmg.com. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that in the case the contract is awarded to him, he will then ten days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to other provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents