Similar Projects
Adams Park Baseball Field and Roadway Improvements
Results
Anthony, NM

Roadway Rehabilitation
Infrastructure
Results
NM

Camino Coyote Lane
Results
$701,403 est. value

Crackseal Project
Infrastructure
Results
$370,000 est. value
NM

Mesquite Elementary School Bus Drop Off Paving Project
Results
Less than $181,207 est. value
Mesquite, NM 88048

Base Course Fill
Post-Bid

2020-2021 Pavement Replacement Project
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Las Cruces, NM

Rainbow Boulevard Improvements Project
Infrastructure
Results

Roadway Reconstruction, Roadway Rehabilitation, Weigh-In-Motion System
Results
NM

Mcfie Ave. Reconstruction and First St. and Village Plaza Utility Replacement
Results
$1,000,000 to $1,500,000 est. value
Las Cruces, NM

Sonoma Springs Avenue Extension
Infrastructure
Results
$1,564,821 est. value
NM

2021-2022 Pavement Replacement- Phase 1
Infrastructure
Results
Las Cruces, NM

Sonoma Ranch Boulevard Mile 1 Construction Project
Infrastructure
Results
$5,566,703 est. value
Las Cruces, NM 88007

Drainage Structures, Roadway Reconstruction
Infrastructure
Results

Solarridge Waterline and Pavement Replacement
Results
Las Cruces, NM

Reported 04/15/2022 12:00 AM
Project Title

Sonoma Ranch Boulevard Mile 3 Construction Project Phase 1

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88007   (Dona Ana County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

These Special Conditions, together with the accompanying documents and maps listed under SC-1 and the Referenced Specifications listed in these documents, cover the requirements for the work as listed in the bid, including incidental appurtenant work. The City reserves the right to shorten, add to, or change the list of work given below. It is intended, at this time, that the following work will be accomplished under this contract: Construction of Sonoma Ranch Blvd. from Arroyo Rd to Paseo Verde Rd., including: gas & storm drain, grading, curb and gutter, sidewalk, paving, pavement markings, street lighting and signage.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents