Similar Projects
Wastewater Treatment Plant 1.5 MGD Expansion
Bidding
Freeport, FL

Duck Key Utility Relocations Horizontal Directional Borings - Harbour Drive and Seaview Drive
Bidding
Less than $1,271,633 est. value
Duck Key, FL

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets
Results
West Palm Beach, FL

Grace Lane and Sandy Court Water Main and Roadway Improvements
Results
Orange Park, FL

Pipe Repair, Replace ,and Mitered End Replacement
Bidding
$248,860 est. value

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Project 10 and 11: Force Main 1 and 2 Replacement
Results
Florida City, FL

Cured-In-Place Pipe Services
Bidding
FL

Design/Build Project - Water and Wastewater Distribution Systems and Rail Switches Improvements
Post-Bid
Callahan, FL 32011

Water Meter-EVO Q4 3
Results
Homestead, FL 33030

Unit Price Contract for Small Pipeline
Term Contract
Post-Bid
Less than $5,000,000 est. value
Sarasota, FL 34230

Ciprianis Subdivision Water Main Replacement
Results
$684,102 est. value
Bradenton, FL 34205

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Last Updated 04/17/2020 02:29 PM
Project Title

Tropical Farms Floridan Wells TFRO 6 and TFRO 7 Raw Watermain Addition

Physical Address View project details and contacts
City, State (County) FL   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Drill and complete two (2) Floridan Aquifer production wells TFRO-6 and TFRO-7 for Martin County Department of Utilities (MCU), Tropical Farms Water Treatment Plant (TFWTP), located in Martin County, Florida. Scope of work includes drilling, setting of steel and pvc casing, grouting, flow testing, wellhead assembly, acidizing (if necessary), well logging, pump testing, formation water disposal system (including temporary piping, pumps, and settling tanks), well facility disinfection and restoration of well site, and final casing termination.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents