Similar Projects
1,4- Dioxane, PFOA And PFOS Treatment at Well 3A - Plumbing Construction
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Albertson, NY 11507

Treatment Improvements for the Removal of 1,4 Dioxane, East Meadow Wells 5 and 11 in the East Meadow Water District
Alteration
Post-Bid
Hempstead, NY

Plumbing Equipment, Supplies, And Mechanical Plumbing Services
Term Contract
Post-Bid
Jericho, NY

On-Call Plumbing Services (City-Wide)
Alteration
Results
Glen Cove, NY 11542

Uniondale Wells 5 & 6 Treatment - Plumbing
Alteration
Results
East Meadow, NY 11554

General Plumbing Services/Repair and Backflow Testing Repair
Alteration
Post-Bid
Port Washington, NY

2021-2022 Capital Improvement Program
Alteration
Results
Oceanside, NY

Plumbing Services - Repair, Servicing, Maintenance, and New Installation
Term Contract
Post-Bid
Manhasset, NY

2021-2022 Capital Improvement Program
Alteration
Results
Jericho, NY 11753

General, Electrical, Plumbing, Building & Yard Emergency Services At LNA Service Stations
Term Contract
Post-Bid

Archer School Cupola Repair, Auditorium & Toilet Upgrades
Alteration
Results
Freeport, NY 11520

Port-a-Potty Rental
Term Contract
Post-Bid
Old Westbury, NY

Dioxane and Nitrates, Levittown Wells 1A And 2A in the Levittown Water District-Plumbing Construction
Alteration
Results
Hempstead, NY

Request for Quotation - Pipe & Fittings
Alteration
Post-Bid
Elmont, NY

Plumbing/Athletic Field Sprinkler System Repairs/Maintenance, Installation and Backflow Testing
Alteration
Results
Floral Park, NY

Last Updated 04/27/2023 12:54 PM
Project Title

2022-2023 Capital Improvement Program Project - Contract 1 - Plumbing Construction

Physical Address View project details and contacts
City, State (County) Oceanside, NY 11572   (Nassau County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $88,000 [brand] Estimate
Plans Available from Copy Center - 03/16/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall be as follows CONTRACT #1- GENERAL CONSTRUCTION CONTRACT #2- PLUMBING RECONSTRUCTION CONTRACT #3 HVAC RECONSTRUCTION CONTRACT #4- ELECTRICAL RECONSTRUCTION SCHOOL #7 Checks for deposits shall be made payable to the OCEANSIDE UFSD All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit shall be refunded to each Bidder only if the plans and specifications are returned, in good condition, with no handwritten notations thereon within (30) calendar days after the bid opening date. All deposits shall be forfeited to the School District after the (30) days have elapsed. ANY PERSON OR CORPORATION WHO FAILS TO SUBMIT A BID SHALL FORFEIT THEIR HARD COPY PLAN DEPOSIT IN ITS ENTIRETY. Each Bidder must deposit, with their sealed bid, security in an amount not less than 10% of the base bid and all Alternate Bids in the proper form subject to the conditions set forth in the Instructions to Bidders (Page 3). Attention of the Bidders is specifically directed to the minimum wage rates to be paid under the contract, as well as to other provisions set forth in the bidding documents. Bidder will also be required to show, to the satisfaction of the OCEANSIDE UFSD that they are carrying Workers' Compensation Insurance as required by law and all other Insurance in amounts not less than that specified under the General Conditions. Performance Bonds and Labor/Material Bonds, as called for in the General Conditions are a requirement of each contract. The OCEANSIDE UFSD reserves the right to reject any or all bids submitted, to waive any informality or irregularity in any bid, and/ or to accept any bid in whole or in part and/ or to award or not award the contract, if in the opinion of the OCEANSIDE UFSD, the best interest of the SCHOOL DISTRICT will thereby be served. This invitation is an offer to receive bids for a contract. he successful Bidder will be required to execute a formal contract in the form contained in the Contract Documents. All bids received after the time stated in the Notice to Bidders will not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of the SCHOOL DISTRICT. Whether sent by mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the place specified. Each Bidder shall agree to hold their bid price for (45) days after the formal bid opening. Per Article 8, Section 220 of the New York State Labor Law, every contractor and sub-contractor shall submit to the SCHOOL DISTRICT within (30) days after issuance of its first payroll, and every (30) days thereafter, a transcript of the original payroll record, as provided by this article, subscribed and affirmed as true under penalties of perjury. he SCHOOL DISTRICT shall be required to receive and maintain such payroll records. The original payrolls or transcripts shall be preserved for (5) years from the completion of the work on the project. Due to the ongoing COVID-19 pandemic and the resulting uncertainty with regard to (a) when the Owner's schools will be in session during 2022, (b) what restrictions, if any, will be applicable to construction activities in the Owner's facilities due to State, Federal or Local orders, laws, regulations or rules related to the COVID-19 pandemic (including but not limited to social distancing, cleaning and disinfection requirements) and (c) the duration of any restrictions imposed on construction activities, the Owner may modify the construction schedule set forth in the Contract/Bid Documents. By submitting a bid, the Bidder acknowledges and agrees that there shall be no additional compensation paid for schedule modifications caused directly or indirectly by the COVID-19 pandemic. The Bidder further acknowledges and agrees that the sole remedy for any schedule modifications or delays caused directly or indirectly by the COVID-19 pandemic shall be an extension of time, if warranted

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents