Similar Projects
Farnell Middle School Referendum Year 3 (Design)
Renovation
Conception
Tampa, FL 33626

Dorothy Thomas Classroom Addition - Liberty Middle School Court Cover - Vellemaire Transportation Site
Addition
Design
$5,023,000 est. value
Tampa, FL 33610

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

PK-8 School UU
New Construction - 180,000 SF
Post-Bid
Apollo Beach, FL 33572

Freedom High School and Liberty Middle School
Renovation
Post-Bid
$13,200,000 est. value
Tampa, FL 33647

Middle School UU, Spoto High Addition and Tinker K-8 Gymnasium and Addition Projects
New Construction, Addition
Results
Tampa, FL 33610

2020 Referendum Projects
Results
Tampa, FL 33612

Valrico Charter School
New Construction - 58,860 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Valrico, FL 33596

Spoto High School Classroom Addition
Addition
Construction
$9,500,000 est. value
Riverview, FL 33578

Robinson HS Referendum Year 3
Renovation
Design
Tampa, FL 33616

High School UUU, Elementary School E and Middle School Conversion to PK-8 School Projects
Results
Tampa, FL 33610

Memorial Middle School HVAC Referendum Phase 2
Renovation
Construction
Tampa, FL 33603

Middle School UU
New Construction
Design
FL

Disaster Recovery Services
Results

Idea Schools - Fowler
New Construction, Renovation - 109,000 SF
Construction
$17,000,000 est. value
Tampa, FL 33612

Last Updated 01/08/2021 09:53 AM
Project Title

2020 Referendum (Year 3) Projects

Physical Address View project details and contacts
City, State (County) Tampa, FL 33647   (Hillsborough County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for Freedom High School entails design and construction management of a partial HVAC system, fire alarm system and gymnasium floor replacements; network infrastructure repair and athletic track. The scope of work for Liberty Middle School entails partial HVAC, fire alarm system, gymnasium floor, telephone/intercom system replacements and network infrastructure repair. The scope of work for Chamberlain High School entails design and construction management of a partial HVAC system, gymnasium floor, telephone/intercom replacements and network infrastructure repair. The scope of work for Robinson High School entails design and construction management of a partial HVAC system, fire alarm system and public address system replacements. The scope of work for Farnell Middle School is separated into a design and construction phase. The design of the HVAC system renovation, fire alarm system, gymnasium floor replacement and athletic track repaving followed by the construction activities the following year. Location: 100227 Freedom HS / Liberty MS 100226 Chamberlain HS 100228 Robinson HS 100229 Farnell MS

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents