Project Title | Construct Mezzanine in Small Air Terminal |
Physical Address | View project details and contacts |
City, State (County) | Balmville, NY 12550 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Interior |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide and install a Mezzanine system in the dimension of 20 feet by 40 feet within the existing interior bays of building 105. Mezzanine span does not have to be completely open underneath but must line up with existing support beams to allow maximum use of the space underneath. Minimum 125psf rated. Mezzanine must have a clearance of 8 feet from floor to lowest point, whether it be the decking or support beams. One set of stairs and railing systems must meet OSHA requirements. The existing fire protection system will be modified to meet the required coverage both under and above the mezzanine. These modifications must be approved by a licensed fire protection engineer and stamped in the state of NY. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |