Similar Projects
Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Widen I-71 From Four to Six Lanes From KY-393
Infrastructure
Conception
$40,000,000 CJ est. value
Crestwood, KY 40014

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Reconstruct Between KY 120 and RR Bridge
Infrastructure
Conception
$1,360,000 CJ est. value
Slaughters, KY 42456

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
$1,250,000 CJ est. value
Williamstown, KY 41097

Address Pavement Condition of Julian M. Carroll Purchase Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Fulton, KY 42041

Improve Safety and Reduce Congestion on KY-536 From Williamswood Road/ Calvary Drive to KY-17
Infrastructure
Conception
$23,790,000 CJ est. value
Independence, KY 41051

Expand/Improve TH Morgan Building - University of Kentucky
Addition, Demolition, Renovation, Infrastructure
Conception
$60,000,000 CJ est. value
Lexington, KY 40508

Improve Whalen Building - University of Kentucky
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Lexington, KY 40508

Construct Greenhouse Complex - University of Kentucky
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Lexington, KY 40508

Construct Event and Conference Center - Murray State University
New Construction, Infrastructure
Conception
$8,198,000 CJ est. value
Murray, KY 42071

Paul Laurence Dunbar High School Expansion - Fayette County Public Schools
Addition, Renovation, Infrastructure
Conception
$17,600,000 CJ est. value
Lexington, KY 40513

Pikeville to VA State Line: Improve US 460/KY 80 from Dunleary Hollow to KY 80 at Beaver Creek
Infrastructure
Conception
$69,500,000 CJ est. value
Pikeville, KY 41501

Improve Safety and Access on US-23
Infrastructure
Conception
$1,880,000 CJ est. value
Langley, KY 41645

Last Updated 06/29/2023 12:13 PM
Project Title

New Park East Lane Phase 1

Physical Address View project details and contacts
City, State (County) Scottsville, KY 42164   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The following bid packages are being solicited at this time: Phase 1 -Demolition -Rough Grading Package -Storm Drainage Piping -Erosion Control -Replacing Topsoil and Seeding -Future Areas -Rip Rap . Phase 1 of the project will consist of site demolition, Rough Grading of the site with storm pipe installation, erosion control installation, replacing of topsoil and seeding future areas, and rip rap installation. Contractors may adjust cut/fill grades to achieve balance on site with the intent on not requiring import or export of additional materials. A Geotech Investigation report will be provided with the bid package. A 5% Bid Bond will be required.A Pre-Bid Meeting will not be held for Phase I. Contractors may contact the Engineer of Record Arnold Consulting Engineers Services, Inc at 270-780- 9445 or by email to d.whitley@a-ces.com for questions related to the plans and specifications. The Allen County Fiscal Court reserves the right to reject any or all bids or waive any informalities in the bidding. No bids shall be withdrawn for a period of thirty (30) days after the opening of bids without consent of the Owner.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents