Similar Projects
Last Updated | 11/20/2021 01:44 AM |
Project Title | Pump Station 2002 Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Brunswick, GA (Glynn County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed under this contract consists of furnishing all labor, materials, tools, equipment and incidentals required to construct, complete in place and ready to operate, a new force main. More specifically the work includes, but is not limited to: Erosion and sedimentation controls. Discharge piping, valves, effluent flow meter, etc. Twelve (12) inch PVC force main with associated fittings and appurtenances. Demolition, structure relocation, and roadway and parking lot repair. Connection to existing force main and pump station. Filling the existing force main with flowable fill. Traffic Control |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |