Similar Projects
HVAC System Replacement - Snyder RC
Alteration
Bidding
$140,000 to $160,000 est. value
Jacksonville, FL 32221

HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Facilities HVAC Integrated Preventative Maintenance Services
Results
Jacksonville, FL 32212

Air Conditioning Filter Replacement
Term Contract
Results
FL

J-- Request for Heating Ventilation an Cooling (HVAC) Piping Removal and Repair.
Post-Bid
Mayport, FL

Downtown - Extend Chilled Water System to New JEA Office and Ed Ball Building
Results
Jacksonville, FL 32202

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Replacement and Repair
Results
Jacksonville, FL 32218

Facilities HVAC Repair and Installation Services for Up to 20 Tons
Alteration
Post-Bid
Jacksonville, FL

Exhaust Fans
Results
Jacksonville, FL

HVAC Service
Infrastructure
Post-Bid
Jacksonville, FL 32212

Rooftop Unit (RTU) Replacement
Results

Purchase, Replace and Upgrade the Computer Room Air Conditioning (CRAC)
Results
Jacksonville, FL 32218

Building 45 Fume Hood Replacement
Results
Less than $174,178 est. value
Jacksonville, FL 32224

Last Updated 03/23/2022 03:42 PM
Project Title

Heating, Ventilation, and Air Conditioning (HVAC) Preventative Maintenance

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32218   (Duval County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor service agreement for the preventative maintenance of Heating, Ventilation, and Air Conditioning (HVAC) equipment at the National Weather Service Forecast Office (WFO) and associated Weather Service Radar (WSR) sites for Ruskin, FL., Melbourne, FL., and Jackson, FL. JAX will not be bid for base year but will be bid for option years. Services include one (1) annual inspection and three (3) month preventive maintenance inspections of all HVAC systems on site. Contractor will provide all belts, filters, humidifier cannisters, and consumables required as part of the overall contract price. Inspections should be on an approximate 90-day interval. Observe all applicable OSHA safety regulations, as well as state and local safety codes and ordinances.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents