Similar Projects
Indian Trail Townhomes
New Construction, Infrastructure - 275,000 SF
Conception
$10,000,000 est. value
Spokane, WA

Ski Resort Lodge and Guest Services Expansion
New Construction, Addition - 9,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Naches, WA 98937

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Alteration
Design
$1,063,000 est. value
Benton City, WA

2021-23 ER Region Wide Basic Safety - Signing
Infrastructure
Design
$782,000 est. value
Spokane, WA 99201

OLYM 184745 Rehabilitate Hurricane Ridge Day Lodge
Renovation
Bidding
$10,000,000 CJ est. value
Port Angeles, WA 98362

Water Improvements Project
Infrastructure
Bidding
$450,000 to $700,000 est. value
Lamont, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Mercy-PeaceHealth Family Housing
New Construction - 53,880 SF
Construction
$2,400,000 est. value
Vancouver, WA 98664

Public Storage #08193 - Northup Way / Bellevue
Demolition, New Construction, Infrastructure - 189,540 SF
Pending Verification
$17,000,000 CJ est. value
Bellevue, WA 98005

Archetype Belltown
New Construction - 103,571 SF
Conception
$10,000,000 CJ est. value
Seattle, WA 98121

Olympic Peninsula Well Decommissioning
Infrastructure
Design
$100,000 to $250,000 est. value
Neah Bay, WA 98357

Potable Water Line Replacement - Clover Park Technical College
Infrastructure
Bidding
$780,000 to $865,000 est. value
Lakewood, WA 98499

Last Updated 07/22/2022 09:05 AM
Project Title

Flintstone Park Restroom Replacement

Physical Address View project details and contacts
City, State (County) Oak Harbor, WA 98277   (Island County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the FLINTSTONE PARK RESTROOM REPLACEMENT PROJECT. At the time and date stated above, the proposals will be publicly opened and read aloud. Proposals are to be submitted only on the forms provided with the Specification. Contractors are invited to submit bids for the FLINTSTONE PARK RESTROOM REPLACE MENT PROJECT in Oak Harbor, Washington. The work shall consist, of demolishing the existing restrooms, constructing concrete slabs, installing owner provided The Portland Loo structures, installing associated electrical, water and sewer connections, and miscellaneous site work. All work shall be in conformance with the Contract Plans, Contract. Provisions, and the 2022 Standard Specifications for Road, Bridge and Municipal Construction The work shall be completed within 90 calendar days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed, in compliance with the request for the Proposal, Plans, Specifications, and. Contract for this project and any addenda issued thereto which are on file at the office of the City Clerk, City Hall, City of Oak Harbor, Washington. The engineers opinion of probable cost ranges from 75,000 to 100,000. The Owner reserves the right to reject any or all bids, to waive irregularities or informalities in the bid or in the bidding, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. The Owner intends to award a contract to the lowest responsible and responsive bidder. Each bid must be accompanied by a cashiers check, money order or surety bid. bond in the amount of not less than five percent (5%) of the total bid, made payable to the City of Oak Harbor. A Performance Bond as well as a Labor and Material Payment Bond will he required with the Contract No bidder may withdraw its bid after the hour set. for opening thereof or before award of contract, which normally occurs within 45 calendar days after bid opening The City of Oak Harbor reserves the: right, to postpone the: award for a period of 60 calendar days after bid opening. Bid securities of the three lowest bidders will be held by the City of Oak Ha rbor until official award of the contract. inquiries should be directed, to The City of Oak Harbor; Brett Arvidson, P.E., Project Manager, email: barvidson@oak.harbor.org, phone. (360)279-4521. The City of Oak Harbor in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded, full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents