Similar Projects
Last Updated | 07/22/2022 09:05 AM |
Project Title | Flintstone Park Restroom Replacement |
Physical Address | View project details and contacts |
City, State (County) | Oak Harbor, WA 98277 (Island County) |
Category(s) | Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Misc. Recreational, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the FLINTSTONE PARK RESTROOM REPLACEMENT PROJECT. At the time and date stated above, the proposals will be publicly opened and read aloud. Proposals are to be submitted only on the forms provided with the Specification. Contractors are invited to submit bids for the FLINTSTONE PARK RESTROOM REPLACE MENT PROJECT in Oak Harbor, Washington. The work shall consist, of demolishing the existing restrooms, constructing concrete slabs, installing owner provided The Portland Loo structures, installing associated electrical, water and sewer connections, and miscellaneous site work. All work shall be in conformance with the Contract Plans, Contract. Provisions, and the 2022 Standard Specifications for Road, Bridge and Municipal Construction The work shall be completed within 90 calendar days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed, in compliance with the request for the Proposal, Plans, Specifications, and. Contract for this project and any addenda issued thereto which are on file at the office of the City Clerk, City Hall, City of Oak Harbor, Washington. The engineers opinion of probable cost ranges from 75,000 to 100,000. The Owner reserves the right to reject any or all bids, to waive irregularities or informalities in the bid or in the bidding, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. The Owner intends to award a contract to the lowest responsible and responsive bidder. Each bid must be accompanied by a cashiers check, money order or surety bid. bond in the amount of not less than five percent (5%) of the total bid, made payable to the City of Oak Harbor. A Performance Bond as well as a Labor and Material Payment Bond will he required with the Contract No bidder may withdraw its bid after the hour set. for opening thereof or before award of contract, which normally occurs within 45 calendar days after bid opening The City of Oak Harbor reserves the: right, to postpone the: award for a period of 60 calendar days after bid opening. Bid securities of the three lowest bidders will be held by the City of Oak Ha rbor until official award of the contract. inquiries should be directed, to The City of Oak Harbor; Brett Arvidson, P.E., Project Manager, email: barvidson@oak.harbor.org, phone. (360)279-4521. The City of Oak Harbor in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded, full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |