Similar Projects
Last Updated | 06/29/2022 12:33 AM |
Project Title | 2022 Overlays - South Phase |
Physical Address | View project details and contacts |
City, State (County) | Anoka, MN (Anoka County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Demolition, site work, paving and new construction of a bridge / tunnel in Fort Walton Beach, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. **As of May 19, 2022 this project has not yet been awarded. The project is expected to be awarded around on May 23, 2022.** Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es) Selection Method : Adjusted Score Response Requested : Letter of Interest SR 30 (US 98) Brooks Bridge Replacement Duration- The Department has established a Contract Duration of 1,720 calendar days for the subject Project. TRC Members (Subject to Change) : Anna Harlson Benjamin Smith Billy Robinson Heather Baril Keith Shores The Financial Project Number associated with this project is 41547425201, 415474-2-56-01 Phase I Selection Date/Time 9/07/2021 07:30 pm Pre-Proposal Meeting Date/Time 9/22/2021 12:00 am Tech Proposal Due Date/Time 2/11/2022 01:30 am Bid Price Due Date/Time 4/21/2022 08:30 pm Bid Opening Date/Time 4/21/2022 09:00 pm Final Selection Date/Time 4/25/2022 07:30 pm FDOT - RFP D/B - SR 30 (US 98) Brooks Bridge Replacement Replacement of Brooks Bridge (Bridge No. 570034) over Santa Rosa Sound in Okaloosa County, Florida This project will also include roadway widening, new roadway connections, and milling and resurfacing within the limits of SR 30 (US 98) from west of SR 145 (Perry Avenue) to Pier Road, side street reconstruction, intersection reconstruction, signalization, Intelligent Transportation Systems, stormwater ponds, storm drain, signing and pavement marking, and replacement of the fender system. The Design-Build Firm will be required to design and construct roadway widening on SR 30 from west of SR 145 to west of Pier Road and two new bridges spanning Santa Rosa Sound. Except as allowed by Section I.A. of this RFP, design and construction shall be consistent with the approved Environmental Assessment (EA) with Finding of No Significant Impact (FONSI) and Reevaluation. The project includes bridge replacement, roadway widening, milling and resurfacing, new roadway connections, side street reconstruction, intersection reconstruction, signalization, stormwater ponds, storm drain, and replacement of the fender system. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |