Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

2021 Concrete Paving Rehabilitation
Post-Bid
Minneapolis, MN

Furman Street Improvements
Results
$115,000 est. value
Columbus, MN 55025

Crooked Lake Boulevard and Robinson Drive Mill and Overlay
Results
Coon Rapids, MN 55433

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Hornsby Street Reconstruction
Results
$1,800,000 to $2,000,000 est. value
Columbus, MN 55025

2022 East Shadow Lake Drive Utility
Infrastructure
Post-Bid
$400,000 to $450,000 est. value
Lino Lakes, MN 55014

2021 Crack Seal Improvements
Results
$165,000 est. value
Ramsey, MN

2022 Street Seal Coat and Crack Repair Project
Infrastructure
Post-Bid
Spring Lake Park, MN

Riverdale Drive Improvements
Results
Ramsey, MN 55303

2022 Hornsby Street Reconstruction - Love's Travel Plaza
Infrastructure
Post-Bid
$200,000 est. value
Columbus, MN 55025

2021 Mill and Overlay and 2021 Curb, Sidewalk and Ped Ramp Repairs
Results
$2,276,000 est. value
Anoka, MN

2022 Kettle River Heights Improvements
Infrastructure
Post-Bid
$200,000 est. value
Columbus, MN

2021 Polk Street Area Street Reconstructions
Results
$2,250,000 est. value
Blaine, MN

Parking Lot Paving Improvements
Infrastructure
Post-Bid
$890,000 est. value
Andover, MN

Last Updated 06/29/2022 12:33 AM
Project Title

2022 Overlays - South Phase

Physical Address View project details and contacts
City, State (County) Anoka, MN   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Fort Walton Beach, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. **As of May 19, 2022 this project has not yet been awarded. The project is expected to be awarded around on May 23, 2022.** Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es) Selection Method : Adjusted Score Response Requested : Letter of Interest SR 30 (US 98) Brooks Bridge Replacement Duration- The Department has established a Contract Duration of 1,720 calendar days for the subject Project. TRC Members (Subject to Change) : Anna Harlson Benjamin Smith Billy Robinson Heather Baril Keith Shores The Financial Project Number associated with this project is 41547425201, 415474-2-56-01 Phase I Selection Date/Time 9/07/2021 07:30 pm Pre-Proposal Meeting Date/Time 9/22/2021 12:00 am Tech Proposal Due Date/Time 2/11/2022 01:30 am Bid Price Due Date/Time 4/21/2022 08:30 pm Bid Opening Date/Time 4/21/2022 09:00 pm Final Selection Date/Time 4/25/2022 07:30 pm FDOT - RFP D/B - SR 30 (US 98) Brooks Bridge Replacement Replacement of Brooks Bridge (Bridge No. 570034) over Santa Rosa Sound in Okaloosa County, Florida This project will also include roadway widening, new roadway connections, and milling and resurfacing within the limits of SR 30 (US 98) from west of SR 145 (Perry Avenue) to Pier Road, side street reconstruction, intersection reconstruction, signalization, Intelligent Transportation Systems, stormwater ponds, storm drain, signing and pavement marking, and replacement of the fender system. The Design-Build Firm will be required to design and construct roadway widening on SR 30 from west of SR 145 to west of Pier Road and two new bridges spanning Santa Rosa Sound. Except as allowed by Section I.A. of this RFP, design and construction shall be consistent with the approved Environmental Assessment (EA) with Finding of No Significant Impact (FONSI) and Reevaluation. The project includes bridge replacement, roadway widening, milling and resurfacing, new roadway connections, side street reconstruction, intersection reconstruction, signalization, stormwater ponds, storm drain, and replacement of the fender system.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents