Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Bidding
$1,280,212 est. value
Kirkland, Woodinville, WA

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Bidding
$350,000 est. value
Tacoma, WA 98402

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Wenas Creek Fish Passage and Screening Project
Infrastructure
Post-Bid
Yakima, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Geosynthetic and Erosion Control
Infrastructure
Bidding
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Post-Bid
$705,000 to $790,000 est. value
Eatonville, WA 98328

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Lower Satsop Right Bank Conservation
Infrastructure
Bidding
Montesano, WA

Precast Reinforced Concrete Split Box Culvert
Infrastructure
Post-Bid
Puyallup, WA 98371

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Last Updated 10/05/2021 01:45 AM
Project Title

Orville Road Engineered Log Jam Setback Revetment Phase

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for improvements along the left bank of the Puyallup River between River Mile 27.4 to 28.4 and includes the construction of (40) engineered logjams consisting of driven un-treated timber piles, large wood, chain lashing, racking, slash, and dolos (8-ton precast concrete units). It also includes approximately 2,800 linear feet of existing levee removal, and the construction of an approximate 150 LF ‘Levee Terminus’ section consisting of large onsite salvaged levee rock. Work includes selective clearing and re-incorporation of woody material into project elements. The project requires procurement of (63) dolos and large quantities of logs, slash, and racking material. It also includes construction of gravel access road, excavation and grading, erosion control, planting, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents