Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Construction of Concrete Ramp
Infrastructure
Design
$247,300 CJ est. value
Tulsa, OK 74105

Construction of Concrete Ramp
Infrastructure
Design
$247,300 CJ est. value
Tulsa, OK 74105

Repair B301 Concrete
Infrastructure
Bidding
$100,000 CJ est. value
Tulsa, OK 74115

7th Street Overlay Project
Infrastructure
Bidding
$300,000 CJ est. value
Jenks, OK 74037

Aggregate
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Asphalt
Term Contract
Sub-Bidding
Broken Arrow, OK 74012

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

Pancho Anaya Bakery
Addition, Demolition, Renovation, Infrastructure - 11,700 SF
Pending Verification
$2,394,737 CJ est. value
Tulsa, OK 74128

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Last Updated 08/10/2022 12:09 AM
Project Title

River West Choice Neighborhoods Initiative Phase V and VI

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,731,850 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The entire cost of the improvement shall be paid from Account No. 2059FR0002.OthSvs.GrntOut.RFlmp. 20001244-534103; 148170.Landlmp.405.4053122- 541103; 22031F00001.StrmSewer.Flood.5618.56183122- 541101;; 2231S00014.Sewerlines.Sewer.7500.75003122- 541101; 2231S000024.Sewerlines.Sewer.7500.75003122 -541101; 21310016Z.WaterDist.Water.7400.74003122- 541101; 2231W00009.WaterDist.Water.7400.74003122- 541101. Bids will be accepted by the City Clerk from the holders of valid pre-qualifications certificates from the City of Tulsa in one or more of the following classifications: A, C, or D Drawings, specifications and contract documents for construction of said public improvements of the said project have been adopted by the Mayor of said City. Contract requirements shall include compliance as required by law pertaining to the practice of nondiscrimination in employment. The overall aspirational Small Business Enterprise utilization goal for this project is ten (10) percent. Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. Attention is called to Resolution 7404 of November 8, 2006, requiring bidders, their subcontractors and their lower-tier subcontractors to hire only citizens of the United States. The City of Tulsa itself is exempt from the payment of any sales or use taxes, and pursuant to Title 68 O.S. Section 1356(10), direct vendors to the City are also exempt from those taxes. A bidder may exclude from his bid appropriate sales taxes, which he will not have to pay while acting for and on behalf of the City of Tulsa. A Certified or Cashier's Check or Bidders Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the City of Tulsa, in conformity with the requirements of the proposed contract documents. The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents