Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Luxe of Buda
New Construction, Infrastructure - 7,066 SF
Design
$750,000 CJ est. value
Buda, TX 78610

Pollo Campero / Austin
New Construction, Infrastructure - 2,582 SF
Design
$2,100,000 CJ est. value
Austin, TX 78748

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

Stephenville Metal Building
New Construction, Infrastructure
Results
$37,146 CJ est. value
Austin, TX 78701

Fire Training Facility
New Construction, Infrastructure - 4,529 SF
Results
$2,777,777 CJ est. value
San Marcos, TX 78666

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Bobcat Stadium End Zone Complex Expansion - Texas State University
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$37,000,000 CJ est. value
San Marcos, TX 78666

Z'Tejas - Dry River District / Kyle
New Construction, Infrastructure - 4,725 SF
Pending Verification
$2,500,000 CJ est. value
Kyle, TX 78640

Bebee Road (From Intersection of IH35 Frontage Rd/Bebee Rd to Intersection of Bebee Rd/Goforth Rd) - City of Kyle
Infrastructure
Conception
$32,700,000 CJ est. value
Kyle, TX 78640

Bobcat Buda
New Construction, Infrastructure - 11,324 SF
Design
$1,300,000 CJ est. value
Buda, TX 78610

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 01/03/2024 04:31 PM
Project Title

IH-35 to Old San Antonio Connector - M06 - City of Buda

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $855,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide for a connection to the IH-35 Southbound Frontage Road from Old San Antonio Road. Currently, direct access to the IH-35 Southbound Frontage Road north of the Cabela’s store main entrance can only be obtained by passing through private property This project is included in the city’s fy 2024-2028 Capital Improvement Program. As of January 3, 2024, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents