Similar Projects
RFP Design - Architectural / Engineering Services for New Anacostia Recreation Center
New Construction, Infrastructure - 65,000 SF
Conception
$1,000,000 CJ est. value
Washington, DC 20020

Hitachi Rail Assembly Plant
New Construction, Infrastructure - 307,000 SF
Conception
Less than $70,000,000 est. value
Washington, DC 20036

Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Benning Road Reconstruction & Streetcar
Infrastructure
Design
Washington, DC 20019

Miscellaneous Facilities Upgrades Phase 8 (MFU-8)
Renovation, Infrastructure
Bidding
$2,075,133 CJ est. value
Washington, DC 20036

Miscellaneous Facilities Upgrades Phase 8 (MFU-8)
Renovation, Infrastructure
Bidding
$2,075,133 CJ est. value
Washington, DC 20036

Sanitary Sewer Lateral Replacement Contract
Term Contract
Sub-Bidding
Washington, DC 20036

RFQ Contractor - Lead Pipe Replacement Assistance Program (LPRAP
Term Contract
Sub-Bidding
Washington, DC 20036

Park Morton Phase III - Site Work
Post-Bid
Washington, DC 20010

Temple Sinai
Renovation, Addition, Demolition - 54,325 SF
Post-Bid
Washington, DC 20015

MPD Blue Plains Impound Lot Modernization
Results
Washington, DC 20032

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Skyland Phase B-1
New Construction - 12,600 SF
Construction
Washington, DC 20020

Park Morton Demo, Site & Infrastructure
New Construction, Infrastructure
Construction
$12,000,000 to $13,000,000 est. value
Washington, DC

RFP Design - Architectural/Engineering Services for New Engine Company 26 Firehouse Facility
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Washington, DC 20018

Last Updated 08/04/2022 01:10 AM
Project Title

District of Columbia Power Line Undergrounding (DC Plug) Feeder 15009

Physical Address View project details and contacts
City, State (County) Washington, DC 20036   (District of Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract consists of Civil Infrastructure Construction for DC PLUG Feeder No. 15009 located Along Georgia Avenue, N.W., Dogwood Street, N.W., Blair Road, N.W., and Rittenhouse Street, N.W.. The scope of work includes, but is not limited to, the following major improvements: 1. The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. 2. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. 3. The furnishing and installation of pea gravel concrete for ductbank encasement. 4. The furnishing and installation of thermal fill for ductbank encasement at transmission feeder crossings. 5. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. 6. Excavation and backfilling of all utility cuts. 7. Temporary restoration of all utility cuts. 8. Permanent restoration of all utility cuts. 9. Restoration of all pavement markings disturbed by the utility cut and pavement restoration work. Upgrade crosswalks to the high visibility type at all intersections within the project limits. 10.Pavement profiling (milling) and overlay (approximately 2 inches) of utility cuts and per plan in accordance with DDOT standards. 11.Installation of topsoil, seed, and mulch on all disturbed earth and grass areas. 12.Installation of replacement curb (in-kind), curb and gutter (in-kind), and sidewalk (in-kind) sections. 13.The installation and use of erosion and sediment control measures meeting DDOT/DOEE standards and per plan. 14.Dust control during pavement sawcutting and excavation operations. 15.Mobilization and demobilization, completion of field layout, provision and maintenance of engineers field facilities, progress photographs, and rodent control. 16.Maintain vehicular, bicycle and pedestrian traffic per DDOT Standard Specifications Section 612 and Attachment J.14 or as directed by the Engineer. Maintain access to residential, institutional and commercial establishments using appropriate means as approved by the Engineer. 17.Maintain service of all existing utilities during construction. Work includes the disposal of all unsalvageable materials and all labor, materials, tools, equipment and incidentals necessary to obtain a complete and finished product. The Contractor shall be fully responsible for protection against damages for the duration of the Contract of all the utility structures within the Contract limits and adjacent thereto. The utilities include but are not limited to public and/or private water, sewer, electricity, gas and communications lines. No separate measurement or payment will be made. Cost of this protective work shall be reflected and distributed among the Contract pay items. Work also includes all incidentals needed to complete the project as shown on the Contract Drawings and within the Special Provisions. Subcontracting Requirement 50% Work Site Location Along Georgia Avenue, N.W., Dogwood Street, N.W., Blair Road, N.W., and Rittenhouse Street, N.W

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Excavation and Fill, Excavation, Fill, Backfill, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents