Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

Canyon Road Sidewalk - 4380 North To Foothill Drive - City Of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Utah Valley University Engineering Building
New Construction, Infrastructure
Bidding
$88,148,000 CJ est. value
Orem, UT 84058

SR-114; US-89 to Geneva Road Preservation High Volume
Infrastructure
Bidding
$3,000,000 CJ est. value
Orem, UT 84059

Wasatch Elementary School Rebuild - Bid Package: BP-01B
Infrastructure
Sub-Bidding
$16,000,000 CJ est. value
Provo, UT 84604

Saratoga Springs Town Center - Retail C (Bout Time) - Excavation & Structural Concrete Package
New Construction, Infrastructure - 5,458 SF
Sub-Bidding
$775,000 CJ est. value
Saratoga Springs, UT 84045

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Wastewater Treatment Plant Expansion Construction Management/General Contractor Services
New Construction
Post-Bid
$23,000,000 est. value
Payson, UT 84651

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Last Updated 10/19/2022 08:38 AM
Project Title

Don A. Christiansen Regional Water Treatment Plant 15-MG Reservoir Seismic Evaluation Condition Assessment and Improvements Project

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Agency's Affiliate - 09/29/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of construction of the Don A. Christiansen Regional Water Treatment Plant 15 MG Reservoir, including the following: (1) replace the existing 48" butterfly valve, torque tube, floor stand, and actuator at the 15 MG Reservoir outlet sump; (2) replace the existing 6" mud valve, stem extension, and supports at the 15 MG Reservoir outlet sump; (3) replace the existing baffle curtains in the same configuration and install a new concrete curb structure to contain the baffle ballast; (4) replace existing FRP washdown piping with SCH 80 PVC piping; (5) clean and caulk existing construction joints of both the 15 MG and 2 MG reservoirs; and (6) repair corrosion and/or spalling on concrete and mechanical piping as needed. Central Utah Water Conservancy District reserves the right to reject any or all Bids, to waive any formality, or technicality in a Bid, and to make Award to the lowest responsive, responsible Bidder if deemed in the best interests of the Owner, or the public good; or as being nonresponsive to the requirements set forth herein, in Section 00 21 13, Instructions to Bidders, or on the grounds that a prospective Contractor is not qualified. Any Bid received from a Bidder who was not invited to bid or received after the closing time for receipt of Bids will be returned unopened. Est. Completion Date: June 1, 2023 Pre-Qualification: Yes Board of Trustees Approve Award October 26, 2022 SITE OF WORK: The site of the work is located at the Don. A. Christiansen Regional Water Treatment Plant at 1120 Cascade Drive, Orem, Utah. Completion- April 15, 2023 - 48" Butterfly Valve Installed and Operational May 15, 2023 - Substantial Completion for the Project June 1, 2023 - Final Acceptance of the Project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents